19 0011_19 0010_4122017_130547.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
16.4 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start
28.6 ft. - Crack Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES
37.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, at 12 o'clock, , within 8 inches of joint: YES
81.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - @ THE JOINTS
82.6 ft. - Deposits Attached Grease, 10 %of cross sectional area, at 12 o'clock, , within 8 inches of joint: YES, Start
102.8 ft. - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES, Start
129.2 ft. - General Observation - SPALLING/GREASE
133.3 ft. - Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start
142.7 ft. - Crack Multiple, from 03 to 05 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 82.6 | DAGS | — |
| 0 | MWM | — |
| 133.3 | CS | — |
| 166.1 | SSS | — |
| 28.6 | CS | — |
| 166.1 | DAGS | — |
| 3.6 | DAGS | POSSIBLE SPALLING |
| 2 | SSS | — |
| 166.1 | CM | — |
| 81.4 | DAGS | @ THE JOINTS |
| 166 | CS | — |
| 102.8 | CS | — |
| 129.2 | MGO | SPALLING/GREASE |
| 142.7 | CM | — |
| 0 | MWL | — |
| 166 | DAGS | — |
| 125.5 | CS | — |
| 37.4 | DAGS | — |
| 0 | AMH | 1:00 PM |
| 166.1 | DAGS | — |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. STOP LOG DOWN |
| 166.2 | MSA | WATER TOO HIGH |
| 16.4 | RFJ | — |
| 166.1 | RFJ | — |