19 0014_19 0013_4122017_093027.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
22.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES
49.9 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start
86.3 ft. - General Photograph - SPALLING
107.2 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR
115.1 ft. - Crack Spiral, from 01 to 02 o'clock, within 8 inches of joint: YES, Start
119.2 ft. - Crack Spiral, from 10 to 11 o'clock, within 8 inches of joint: YES, Start
139.3 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES
151.6 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES
184 ft. - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES
202.1 ft. - Crack Multiple, from 11 to 01 o'clock, within 8 inches of joint: YES, Start
207.8 ft. - Roots Fine Joint, from 08 to 04 o'clock, within 8 inches of joint: YESR, Start
280.6 ft. - General Photograph - FINE ROOTS
| Distance | Code | Observation |
|---|---|---|
| 207.8 | RFJ | — |
| 55.5 | CL | — |
| 207.8 | CM | — |
| 86.3 | MGP | SPALLING |
| 184 | CL | — |
| 139.3 | CL | — |
| 107.2 | RFJ | — |
| 0 | AMH | 8:58 AM |
| 379.9 | RFJ | — |
| 280.6 | MGP | FINE ROOTS |
| 22.8 | DAGS | — |
| 381.9 | AMH | 10:04 AM |
| 119.2 | CS | — |
| 0 | MWM | — |
| 115.1 | CS | — |
| 2 | SSS | — |
| 151.6 | CL | — |
| 119.2 | CS | — |
| 0 | MWL | — |
| 379.9 | SSS | — |
| 202.1 | CM | — |
| 122.2 | CS | — |
| 49.9 | CL | — |