19 0019_19 0018_472017_083634.mp4
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
23.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: YES
30.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES
38.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start
38.6 ft. - Crack Multiple, from 12 to 02 o'clock, within 8 inches of joint: YES
42.8 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 09 o'clock, , within 8 inches of joint: YES
55.1 ft. - Joint Offset Medium, 1"
59.2 ft. - General Photograph - GREASE @ JOINTS
| Distance | Code | Observation |
|---|---|---|
| 118 | MGO | Grease Throughout The Reach (5%) |
| 0 | AMH | 8:16 AM |
| 0 | MGO | Conn. @ Mh, 1 O' Clock. Active |
| 55.1 | JOM | — |
| 2 | SSS | — |
| 23.7 | DAGS | — |
| 116.2 | SSS | — |
| 30.9 | DAGS | — |
| 42.8 | DAGS | — |
| 38.6 | DAGS | — |
| 59.2 | MGP | GREASE @ JOINTS |
| 0 | MWL | — |
| 0 | MWM | — |
| 116.2 | DAGS | — |
| 118 | AMH | 8:52 AM |
| 38.6 | CM | — |