Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Apr 6, 2017, 05:11 PM
  • 19 0022_19 0021_462017_101926.mp4

Date
04/06/2017
W/O
0602259
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00727
PipeID
P15052
Time
10:11 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7379
Sewer Name
19 PALO VERDE TRUNK
City
LONG BEACH
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
09
Purpose
Routine Assessment
Project
20170406DF_PALO_VERDE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
24 in.
Upstream MH
19 0022
Downstream MH
19 0021
Dir. of Survey
Downstream
Length Surveyed
287.3 ft.
Total Length
287.3 ft.
Structural Index
2
Structural Quick
2800
Structural Rating
16
O&M Index
2
O&M Quick
2700
O&M Rating
14
Overall Index
2
Overall Quick
Overall Rating
30
Pipe schematic from manhole 19 0022 to 19 0021
MH: 19 0022MH: 19 0021downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:12 AM0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start49.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES60.1 ft. SSS - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: YES74 ft. CS - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES74.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES79.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock, , within 8 inches of joint: YES - POSSIBLY GREASE99.7 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES99.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock, , within 8 inches of joint: YES - POSSIBLY GREASE139.9 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES139.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 09 o'clock, , within 8 inches of joint: YES144.6 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES144.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 01 to 05 o'clock, , within 8 inches of joint: YES210.7 ft. CS - Crack Spiral, from 10 to 12 o'clock, within 8 inches of joint: YES210.7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES256.3 ft. CS - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES284.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish287.3 ft. AMH - Downstream Manhole, Survey Ends - 10:56 AM287.3 ft. MGO - General Observation - Grease Throughout The Reach (5%)287.3 ft. MGO - General Observation - ROACHES @ MH

Observation photos (15)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 12 o'clock,  , within 8 inches of joint: YES

    49.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 12 o'clock, , within 8 inches of joint: YES

  • Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: YES

    60.1 ft. - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

    74 ft. - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock,  , within 8 inches of joint: YES

    74.4 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock,  , within 8 inches of joint: YES - POSSIBLY GREASE

    79.2 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock, , within 8 inches of joint: YES - POSSIBLY GREASE

  • Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

    99.7 ft. - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock,  , within 8 inches of joint: YES - POSSIBLY GREASE

    99.7 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 05 o'clock, , within 8 inches of joint: YES - POSSIBLY GREASE

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    139.9 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 09 o'clock,  , within 8 inches of joint: YES

    139.9 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 09 o'clock, , within 8 inches of joint: YES

  • Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

    144.6 ft. - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 01 to 05 o'clock,  , within 8 inches of joint: YES

    144.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 01 to 05 o'clock, , within 8 inches of joint: YES

  • Crack Spiral, from 10 to 12 o'clock, within 8 inches of joint: YES

    210.7 ft. - Crack Spiral, from 10 to 12 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 10 o'clock,  , within 8 inches of joint: YES

    210.7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES

  • Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

    256.3 ft. - Crack Spiral, from 08 to 11 o'clock, within 8 inches of joint: YES

Observations (23)

DistanceCodeObservation
139.9CL
287.3AMH10:56 AM
2SSS
256.3CS
210.7CS
74CS
60.1SSS
144.6CL
49.1DAGS
0AMH10:12 AM
139.9DAGS
99.7CL
287.3MGOGrease Throughout The Reach (5%)
79.2DAEPOSSIBLY GREASE
0MWL
99.7DAEPOSSIBLY GREASE
0MWM
0MGOROACHES @ MH
144.6DAGS
74.4DAE
287.3MGOROACHES @ MH
210.7DAGS
284.8SSS

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-04-06T10:11:22-07:00