C 0403_C 0402_3282017_091741.mp4
0 ft. - Upstream Manhole, Survey Begins - 9:17 AM
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
11.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
32.8 ft. - Water Level, Sag in pipe, 30 %of cross sectional area, Start
39.2 ft. - General Observation - CHIPPING
109.5 ft. - General Observation - GASKET HANGING OUT
137.2 ft. - Joint Separated Medium
291.3 ft. - General Observation - CHIPPING
319.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES
355.6 ft. - General Photograph - SAG/DIP IN GRADE
372.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
| Distance | Code | Observation |
|---|---|---|
| 0 | MWL | — |
| 39.2 | MGO | CHIPPING |
| 109.5 | MGO | GASKET HANGING OUT |
| 423.8 | MWLS | — |
| 0 | MWM | — |
| 425.3 | AMH | 9:45 AM |
| 2 | SSS | — |
| 423.8 | SSS | — |
| 137.2 | JSM | — |
| 355.6 | MGP | SAG/DIP IN GRADE |
| 372.3 | SSS | — |
| 424.3 | MGO | ROACHES INSIDE THE MH. |
| 32.8 | MWLS | — |
| 0 | MGO | ROACHES INSIDE THE MH. |
| 11.3 | SSS | — |
| 319.7 | SSS | — |
| 424 | MGO | SLIGHT GREASE THROUGHOUT THE REACH |
| 291.3 | MGO | CHIPPING |
| 0 | AMH | 9:17 AM |