Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 9, 2017, 10:23 AM
  • J 0053_J 0052_392017_022958.mp4

Date
03/09/2017
W/O
0613589
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00062
PipeID
P11630
Time
2:23 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
HO461
Sewer Name
J JOINT OUTFALL J - UNIT 2C
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Capital Improvement Program Assesment
Project
20170308MDM_JOINT_OUTFALL_J_UNIT_2C
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Upstream MH
J 0053
Downstream MH
J 0052
Dir. of Survey
Downstream
Length Surveyed
317.9 ft.
Total Length
317.9 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole J 0053 to J 0052
MH: J 0053MH: J 0052downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:30AM2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT2 ft. MGO - General Observation - MAG COAT 80% START 8:00 TO 4:0040.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG143 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active- POSSIBLE IN FILTRATION AROUND CONN271.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG317.3 ft. MGO - General Observation - MAG COAT 80% FINISH317.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG UNDER MAG COAT317.9 ft. AMH - Downstream Manhole, Survey Ends - 3:00AM

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

  • General Observation - MAG COAT 80% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 80% START 8:00 TO 4:00

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    40.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active- POSSIBLE IN FILTRATION AROUND CONN

    143 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active- POSSIBLE IN FILTRATION AROUND CONN

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    271.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (12)

DistanceCodeObservation
317.9AMH3:00AM
2SAPSEVERE AGG UNDER MAG COAT
143TFActive- POSSIBLE IN FILTRATION AROUND CONN
271.1SAPSEVERE AGG
0MWM
40.9SAPSEVERE AGG
2MGOMAG COAT 80% START 8:00 TO 4:00
317.3MGOMAG COAT 80% FINISH
0MGOConn. @ Mh, 3 O' Clock. Active
0MWL
317.3SAPSEVERE AGG UNDER MAG COAT
0AMH2:30AM

Properties (4)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
2
customer
LACSD
datetime
2017-03-09T02:23:08-08:00