Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 8, 2017, 09:32 AM
  • J 0057_J 0056_382017_030157.mp4

Date
03/08/2017
W/O
0613589
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00062
PipeID
P11634
Time
1:32 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
HO460
Sewer Name
J JOINT OUTFALL J - UNIT 2C
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Capital Improvement Program Assesment
Project
20170308MDM_JOINT_OUTFALL_J_UNIT_2C
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Upstream MH
J 0057
Downstream MH
J 0056
Dir. of Survey
Downstream
Length Surveyed
714.4 ft.
Total Length
714.4 ft.
Structural Index
4
Structural Quick
5133
Structural Rating
14
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
4
Overall Quick
Overall Rating
14
Pipe schematic from manhole J 0057 to J 0056
MH: J 0057MH: J 0056downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 2:30AM2 ft. MGO - General Observation - MAG COAT 80% START 8:00 TO 4:002 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT396.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG496.1 ft. SRV - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR660.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG714 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG714 ft. MGO - General Observation - MAG COAT 80% FINISH714.4 ft. AMH - Downstream Manhole, Survey Ends - 3:05AM

Observation photos (5)

  • General Observation - MAG COAT 80% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 80% START 8:00 TO 4:00

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    396.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR

    496.1 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - LONG REBAR

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    660.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (11)

DistanceCodeObservation
2MGOMAG COAT 80% START 8:00 TO 4:00
396.6SAPSEVERE AGG
0MWL
2SAPSEVERE AGG UNDER MAG COAT
714.4AMH3:05AM
0MWM
714SAPSEVERE AGG
714MGOMAG COAT 80% FINISH
660.5SAPSEVERE AGG
0AMH2:30AM
496.1SRVLONG REBAR

Properties (4)

custom_field_three
SEVERE AGG PROJECTING-1 LONG REBAR
custom_field_two
2
customer
LACSD
datetime