Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 8, 2017, 09:30 AM
  • J 0058_J 0057_382017_021011.mp4

Date
03/08/2017
W/O
0613589
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00062
PipeID
P11635
Time
1:30 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0460
Sewer Name
J JOINT OUTFALL J - UNIT 2C
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Capital Improvement Program Assesment
Project
20170308MDM_JOINT_OUTFALL_J_UNIT_2C
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Upstream MH
J 0058
Downstream MH
J 0057
Dir. of Survey
Downstream
Length Surveyed
673.8 ft.
Total Length
673.8 ft.
Structural Index
3
Structural Quick
3300
Structural Rating
9
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole J 0058 to J 0057
MH: J 0058MH: J 0057downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:35AM0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT2 ft. MGO - General Observation - MAG COAT 80% START 8:00 TO 4:0048.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG224.8 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active-POSSIBLE INFILTRATION AROUND CONN523.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG673.4 ft. MGO - General Observation - MAG COAT 80% FINISH673.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG673.8 ft. AMH - Downstream Manhole, Survey Ends - 2:15AM

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG UNDER MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    48.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active-POSSIBLE INFILTRATION AROUND CONN

    224.8 ft. - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Active-POSSIBLE INFILTRATION AROUND CONN

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    523.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (11)

DistanceCodeObservation
0AMH1:35AM
0MWL
2SAPSEVERE AGG UNDER MAG COAT
48.3SAPSEVERE AGG
673.4MGOMAG COAT 80% FINISH
673.8AMH2:15AM
224.8TFActive-POSSIBLE INFILTRATION AROUND CONN
673.4SAPSEVERE AGG
0MWM
523.8SAPSEVERE AGG
2MGOMAG COAT 80% START 8:00 TO 4:00

Properties (4)

custom_field_three
SEVERE AGG PROJECTING
custom_field_two
2
customer
LACSD
datetime
2017-03-08T01:30:22-08:00