18 0466_18 0465_362017_041442.mp4
0.7 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE
0.7 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
0.7 ft. - General Observation - MAG COAT 90% START 9:00 TO 3:00
2.6 ft. - Surface Reinforcement Visible, from 01 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
198.9 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG
207.8 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM REBAR
216.6 ft. - Surface Spalling, from 12 to 02 o'clock, within 8 inches of joint: NO - PEELING CONCRETE SEVERE AGG ATTACHED
240.6 ft. - Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
240.6 ft. - Surface Reinforcement Corroded, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
271.9 ft. - Water Mark, 70 %of cross sectional area
| Distance | Code | Observation |
|---|---|---|
| 0.7 | SSS | PEELING CONCRETE |
| 0 | MWM | — |
| 293.7 | AMH | 4:35AM |
| 293.3 | SAM | SEVERE AGG |
| 2.6 | SRV | CIRCUM REBAR |
| 271.9 | MWM | — |
| 198.9 | SAP | SEVERE AGG |
| 216.6 | SSS | PEELING CONCRETE SEVERE AGG ATTACHED |
| 293.3 | SSS | PEELING CONCRETE SEVERE AGG ATTCHED |
| 0 | MWL | — |
| 0.7 | SAM | SEVERE AGG |
| 260 | SRC | CIRCUM |
| 0.7 | MGO | MAG COAT 90% START 9:00 TO 3:00 |
| 0 | AMH | 4:10AM |
| 260 | SRC | CIRCUM |
| 293.3 | MGO | MAG COAT 90% FINISH |
| 240.6 | SRC | CIRCUM REBAR |
| 5.9 | SRV | CIRCUM REBAR |
| 207.8 | SRV | CIRCUM REBAR |
| 240.6 | SRC | CIRCUM REBAR |