18 0467_18 0466_362017_033214.mp4
2 ft. - General Observation - MAG COAT90% START 9:00 TO 3:00
10.1 ft. - Surface Aggregate Visible, from 01 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG
11.9 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
17.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG
31.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PELING CONCRETE AGG ATTACHED
127.4 ft. - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
129 ft. - Surface Reinforcement Visible, at 03 o'clock, within 8 inches of joint: YES, Start - LONG REBAR
175.6 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
176.5 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES, Start - CIRCUM REBAR
| Distance | Code | Observation |
|---|---|---|
| 0 | MWM | — |
| 278.5 | MGO | MAG COAT 80% FINISH |
| 0 | MWL | — |
| 70 | TF | Open |
| 175.6 | SRV | CIRCUM REBAR |
| 132.9 | SRV | LONG REBAR |
| 132.9 | SAV | CIRCUM REBAR |
| 176.5 | SRV | CIRCUM REBAR |
| 11.9 | SAM | SEVERE AGG |
| 278.8 | AMH | 3:55AM |
| 278.5 | SAM | SEVERE AGG |
| 95.4 | TF | Open |
| 122.4 | TF | Open |
| 127.4 | SAV | CIRCUM REBAR |
| 31.4 | SSS | PELING CONCRETE AGG ATTACHED |
| 181.5 | SRV | CIRCUM REBAR |
| 145.5 | TF | Open |
| 2 | MGO | MAG COAT90% START 9:00 TO 3:00 |
| 43.7 | TF | Open |
| 10.1 | SAV | SEVERE AGG |
| 17.8 | SAP | SEVERE AGG |
| 11.3 | TF | Open |
| 0 | AMH | 3:20AM |
| 129 | SRV | LONG REBAR |
| 278.5 | SSS | PEELING CONCRETE SEVERE AGG ATTACHED |
| 181.5 | SRV | CIRCUM REBAR |