Wastewater/Activity/PacpInspection/1.0Feb 24, 2017, 04:48 PM
  • B 0239_B 0238_2242017_121756.mp4

Date
02/24/2017
W/O
0626070
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00077
PipeID
P08707
Time
8:48 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7341
Sewer Name
B JOINT OUTFALL B - UNIT 1E
City
MONTEBELLO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
11
Purpose
Maintenance Related
Project
20170224DF_JOINT_OUTFALL_B_UNIT_1E
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
B 0239
Downstream MH
B 0238
Dir. of Survey
Downstream
Length Surveyed
326.2 ft.
Total Length
326.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole B 0239 to B 0238
MH: B 0239MH: B 0238downstream0 ft. AMH - Upstream Manhole, Survey Begins - 12:02 PM0 ft. MWM - Water Mark, 40 %of cross sectional area0.1 ft. MWL - Water Level, 35 %of cross sectional area2 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start100.5 ft. MMC - Material Change, Other (state in comments) - CLAY PIPE/POSSIBLE REPAIR101.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"174.4 ft. MMC - Material Change, Other (state in comments) - CLAY PIPE/POSSIBLE REPAIR175.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"286.3 ft. MGP - General Photograph - CHIPPING 10 TO 4 O'CLOCK324.7 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish324.7 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish326.2 ft. AMH - Downstream Manhole, Survey Ends - 12:40 PM

Observation photos (3)

  • Material Change, Other (state in comments) - CLAY PIPE/POSSIBLE REPAIR

    100.5 ft. - Material Change, Other (state in comments) - CLAY PIPE/POSSIBLE REPAIR

  • Material Change, Other (state in comments) - CLAY PIPE/POSSIBLE REPAIR

    174.4 ft. - Material Change, Other (state in comments) - CLAY PIPE/POSSIBLE REPAIR

  • General Photograph - CHIPPING 10 TO 4 O'CLOCK

    286.3 ft. - General Photograph - CHIPPING 10 TO 4 O'CLOCK

Observations (13)

DistanceCodeObservation
2SSSC
2SAVC
175.4TFC
0AMH12:02 PM
324.7SAVC
324.7SSSC
100.5MMCCLAY PIPE/POSSIBLE REPAIR
101.8TFC
286.3MGPCHIPPING 10 TO 4 O'CLOCK
174.4MMCCLAY PIPE/POSSIBLE REPAIR
326.2AMH12:40 PM
0.1MWL
0MWM

Properties (3)

custom_field_two
2
customer
LACSD
datetime
2017-02-24T08:48:37-08:00