0 ft. - Upstream Manhole, Survey Begins - 11:19 AM
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
5.8 ft. - Repair Other, within 8 inches of joint: YES, Start - VCP CAP
8.1 ft. - General Photograph - VCP CAP
12.5 ft. - Repair Other, within 8 inches of joint: YES, Finish - VCP CAP
16.5 ft. - Water Level, 100 %of cross sectional area
17.1 ft. - Survey Abandoned - VIEW OF THE DOWNLEG PIPE OF THE U/S SIPHON