Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 13, 2017, 06:52 PM
  • B 0238_B 0237_2132017_105522.mp4

Date
02/13/2017
W/O
0623303
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00077
PipeID
P08706
Time
10:52 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7331
Sewer Name
B JOINT OUTFALL B - UNIT 1E
City
MONTEBELLO
Loc. details
Other
Location Code
Z
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
11
Purpose
Routine Assessment
Project
20170213AM_JOINT_OUTFALL_B_UNIT_1E
Material
NRCP
Shape
Circular
Height
21 in.
Upstream MH
B 0238
Downstream MH
B 0237
Dir. of Survey
Downstream
Length Surveyed
93.2 ft.
Total Length
93.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole B 0238 to B 0237
MH: B 0238MH: B 0237downstream0 ft. AMH - Upstream Manhole, Survey Begins - 10:53 AM0 ft. MGO - General Observation - RIM/FRAME0 ft. MGO - General Observation - CHANNEL0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - SHELVES0 ft. MGO - General Observation - WALLS0 ft. MGO - General Observation - ROOF2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start65 ft. MWL - Water Level, 30 %of cross sectional area90.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish90.3 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish92.5 ft. MGO - General Observation - UNKNOWN CONN. INSIDE THE MH. @ 09 O'CLOCK93.2 ft. AMH - Downstream Manhole, Survey Ends - 11:14 AM

Observation photos (12)

  • Upstream Manhole, Survey Begins - 10:53 AM

    0 ft. - Upstream Manhole, Survey Begins - 10:53 AM

  • General Observation - RIM/FRAME

    0 ft. - General Observation - RIM/FRAME

  • General Observation - CHANNEL

    0 ft. - General Observation - CHANNEL

  • Water Level, 20 %of cross sectional area

    0 ft. - Water Level, 20 %of cross sectional area

  • Water Level, 15 %of cross sectional area

    0 ft. - Water Level, 15 %of cross sectional area

  • General Observation - SHELVES

    0 ft. - General Observation - SHELVES

  • General Observation - WALLS

    0 ft. - General Observation - WALLS

  • General Observation - ROOF

    0 ft. - General Observation - ROOF

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Water Level, 30 %of cross sectional area

    65 ft. - Water Level, 30 %of cross sectional area

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    90.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (15)

DistanceCodeObservation
0AMH10:53 AM
0MGORIM/FRAME
0MGOCHANNEL
93.2AMH11:14 AM
0MWL
0MWL
0MGOSHELVES
90.3SSS
65MWL
2SSS
92.5MGOUNKNOWN CONN. INSIDE THE MH. @ 09 O'CLOCK
90.3SAV
2SAV
0MGOWALLS
0MGOROOF

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-02-13T10:52:35-08:00