Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2017, 04:04 PM
  • 08 0407_08 0406_2102017_091540.mp4

Date
02/10/2017
W/O
0613584
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00002
PipeID
P00460
Time
8:04 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7329
Sewer Name
08 DAVIDSON CITY TRUNK, SECTION 4
City
LONG BEACH
Loc. details
Parking Lot
Location Code
G
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
09
Purpose
Routine Assessment
Project
20170209DF_DAVIDSON_CITY_TRUNK_SECTION_4
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
08 0407
Downstream MH
08 0406
Dir. of Survey
Downstream
Length Surveyed
107.7 ft.
Total Length
107.7 ft.
Structural Index
4
Structural Quick
5231
Structural Rating
15
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
17
Pipe schematic from manhole 08 0407 to 08 0406
MH: 08 0407MH: 08 0406downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 8:40 AM0 ft. MWL - Water Level, 5 %of cross sectional area0.1 ft. MGO - General Observation - ROACHES @ MH2 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start9.2 ft. B - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES - @ THE JOINT10.7 ft. MGP - General Photograph - BROKEN PIPE11.5 ft. TBA - Tap Break-In Active, at 11 o'clock, -, within 8 inches of joint: YES, 4"20.2 ft. B - Broken, from 09 to 12 o'clock, within 8 inches of joint: YES78.5 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"107.6 ft. MGP - General Photograph - ROD/STICK107.7 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish107.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish107.7 ft. AMH - Downstream Manhole, Survey Ends - 9:3 AM

Observation photos (5)

  • Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Broken, from 12 to 12 o'clock, within 8 inches of joint: YES - @ THE JOINT

    9.2 ft. - Broken, from 12 to 12 o'clock, within 8 inches of joint: YES - @ THE JOINT

  • General Photograph - BROKEN PIPE

    10.7 ft. - General Photograph - BROKEN PIPE

  • Broken, from 09 to 12 o'clock, within 8 inches of joint: YES

    20.2 ft. - Broken, from 09 to 12 o'clock, within 8 inches of joint: YES

  • General Photograph - ROD/STICK

    107.6 ft. - General Photograph - ROD/STICK

Observations (15)

DistanceCodeObservation
0MWM
0.1MGOROACHES @ MH
0AMH8:40 AM
107.7SSSC
78.5TBC
11.5TBA
9.2B@ THE JOINT
2SSSC
107.7CM
107.7AMH9:3 AM
20.2B
107.6MGPROD/STICK
0MWL
2CM
10.7MGPBROKEN PIPE

Properties (4)

additional_info
INSPECTION WAS ABONDONED DUE TO A STICK/ROD IN THE LINE 104' D/S OF MH 407
custom_field_two
1
customer
LACSD
datetime
2017-02-10T08:04:04-08:00