Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 8, 2017, 09:14 AM
  • 03 0335_03 0334_282017_020106.mp4

Date
02/08/2017
W/O
0619904
Weather
Light Rain
Operator/Surveyor
MARTIN
Sewer ID
Z00359
PipeID
P04909
Time
1:14 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0434
Sewer Name
03 ANAHEIM STREET TRUNK
City
ANAHEIM
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
24
Purpose
Capital Improvement Program Assesment
Project
20170208MDM_ANAHEIM_STREET_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
03 0335
Downstream MH
03 0334
Dir. of Survey
Downstream
Length Surveyed
326.4 ft.
Total Length
326.4 ft.
Structural Index
5
Structural Quick
5F41
Structural Rating
169
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
5
Overall Quick
Overall Rating
173
Pipe schematic from manhole 03 0335 to 03 0334
MH: 03 0335MH: 03 0334downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:25AM0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active2 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM & LONG REBAR MISSING2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG3.1 ft. SMW - Surface Missing Wall, from 09 to 01 o'clock, within 8 inches of joint: YES - SOIL VISIBLE SMALL VOID5.2 ft. SMW - Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL7.3 ft. SMW - Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL10.4 ft. MGP - General Photograph - SOIL VISIBLE START10.4 ft. SMW - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SOIL VISIBLE14 ft. SMW - Surface Missing Wall, from 02 to 03 o'clock, within 8 inches of joint: YES - SOIL18.5 ft. SMW - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL18.5 ft. SMW - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES - SMALL VOID21.4 ft. SMW - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL23.5 ft. SMW - Surface Missing Wall, at 02 o'clock, within 8 inches of joint: NO - SOIL25.7 ft. SMW - Surface Missing Wall, at 02 o'clock, within 8 inches of joint: YES - SOIL28.1 ft. SMW - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL31.3 ft. SMW - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL33.7 ft. SMW - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: NO - SOIL38.3 ft. SMW - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL43.5 ft. SMW - Surface Missing Wall, at 02 o'clock, within 8 inches of joint: YES - SOIL45.5 ft. SMW - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES - SOIL VISIBLE49.2 ft. SMW - Surface Missing Wall, from 01 to 03 o'clock, within 8 inches of joint: YES - SOIL54.8 ft. SMW - Surface Missing Wall, at 02 o'clock, within 8 inches of joint: YES - SOIL 3" X3"57.1 ft. SMW - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL75.3 ft. SMW - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL94.7 ft. SMW - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES - MEDIUM VOID-SOIL98.3 ft. SMW - Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: NO - DEEP VOID128.8 ft. SMW - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES - SMALL VOID173.4 ft. SMW - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES, Finish - SOIL VISIBLE179.7 ft. SMW - Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: YES - SOIL182.4 ft. SMW - Surface Missing Wall, at 10 o'clock, within 8 inches of joint: YES - SOIL 3" X3"184.6 ft. SMW - Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: YES - SOIL187 ft. SMW - Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: YES - SOIL187.4 ft. SMW - Surface Missing Wall, at 02 o'clock, within 8 inches of joint: YES - SOIL 8" X6"197.2 ft. SMW - Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - 8" X8" SOIL202 ft. SMW - Surface Missing Wall, at 10 o'clock, within 8 inches of joint: YES - SOIL238.8 ft. SMW - Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL286.1 ft. SMW - Surface Missing Wall, at 10 o'clock, within 8 inches of joint: NO - SOIL 8" X3"326 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG326 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - CIRCUM & LONG REBAR MISSING326 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active326.4 ft. AMH - Downstream Manhole, Survey Ends - 2:15AM

Observation photos (27)

  • Surface Missing Wall, from 09 to 01 o'clock, within 8 inches of joint: YES - SOIL VISIBLE SMALL VOID

    3.1 ft. - Surface Missing Wall, from 09 to 01 o'clock, within 8 inches of joint: YES - SOIL VISIBLE SMALL VOID

  • Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL

    5.2 ft. - Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL

    7.3 ft. - Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL

  • General Photograph - SOIL VISIBLE START

    10.4 ft. - General Photograph - SOIL VISIBLE START

  • Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SOIL VISIBLE

    10.4 ft. - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES, Start - SOIL VISIBLE

  • Surface Missing Wall, from 02 to 03 o'clock, within 8 inches of joint: YES - SOIL

    14 ft. - Surface Missing Wall, from 02 to 03 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

    18.5 ft. - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES -  SMALL VOID

    18.5 ft. - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES - SMALL VOID

  • Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

    21.4 ft. - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, at 02 o'clock, within 8 inches of joint: NO - SOIL

    23.5 ft. - Surface Missing Wall, at 02 o'clock, within 8 inches of joint: NO - SOIL

  • Surface Missing Wall, at 02 o'clock, within 8 inches of joint: YES - SOIL

    25.7 ft. - Surface Missing Wall, at 02 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

    28.1 ft. - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: NO - SOIL

    33.7 ft. - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: NO - SOIL

  • Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

    38.3 ft. - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, at 02 o'clock, within 8 inches of joint: YES - SOIL

    43.5 ft. - Surface Missing Wall, at 02 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES - SOIL VISIBLE

    45.5 ft. - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES - SOIL VISIBLE

  • Surface Missing Wall, from 01 to 03 o'clock, within 8 inches of joint: YES - SOIL

    49.2 ft. - Surface Missing Wall, from 01 to 03 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

    57.1 ft. - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

    75.3 ft. - Surface Missing Wall, from 01 to 02 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES - MEDIUM VOID-SOIL

    94.7 ft. - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES - MEDIUM VOID-SOIL

  • Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: NO - DEEP VOID

    98.3 ft. - Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: NO - DEEP VOID

  • Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES - SMALL VOID

    128.8 ft. - Surface Missing Wall, from 09 to 11 o'clock, within 8 inches of joint: YES - SMALL VOID

  • Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: YES - SOIL

    179.7 ft. - Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: YES - SOIL

    184.6 ft. - Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: YES - SOIL

    187 ft. - Surface Missing Wall, from 10 to 11 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, at 10 o'clock, within 8 inches of joint: YES - SOIL

    202 ft. - Surface Missing Wall, at 10 o'clock, within 8 inches of joint: YES - SOIL

  • Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL

    238.8 ft. - Surface Missing Wall, from 09 to 10 o'clock, within 8 inches of joint: YES - SOIL

Observations (44)

DistanceCodeObservation
326SAMSEVERE AGG
18.5SMWSOIL
5.2SMWSOIL
173.4SMWSOIL VISIBLE
3.1SMWSOIL VISIBLE SMALL VOID
7.3SMWSOIL
31.3SMWSOIL
187SMWSOIL
2SRCCIRCUM & LONG REBAR MISSING
0MWL
57.1SMWSOIL
25.7SMWSOIL
21.4SMWSOIL
33.7SMWSOIL
18.5SMWSMALL VOID
326SRCCIRCUM & LONG REBAR MISSING
49.2SMWSOIL
326MGOConn. @ Mh, 3 O' Clock. Active
10.4MGPSOIL VISIBLE START
326.4AMH2:15AM
28.1SMWSOIL
98.3SMWDEEP VOID
2SAMSEVERE AGG
184.6SMWSOIL
202SMWSOIL
23.5SMWSOIL
179.7SMWSOIL
197.2SMW8" X8" SOIL
128.8SMWSMALL VOID
10.4SMWSOIL VISIBLE
54.8SMWSOIL 3" X3"
43.5SMWSOIL
14SMWSOIL
0AMH1:25AM
0MWM
187.4SMWSOIL 8" X6"
0MGOConn. @ Mh, 3 O' Clock. Active
286.1SMWSOIL 8" X3"
182.4SMWSOIL 3" X3"
238.8SMWSOIL
38.3SMWSOIL
45.5SMWSOIL VISIBLE
75.3SMWSOIL
94.7SMWMEDIUM VOID-SOIL

Properties (4)

custom_field_three
SOIL VISIBLE VOIDS
custom_field_two
1
customer
LACSD
datetime
2017-02-08T01:14:48-08:00