F 0152_F 0151_222017_013944.mp4
2 ft. - General Observation - MAG COAT 90% 8:00 TO 4:00 START
37.8 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
41.1 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES - FLACKING CONCRETE
96.8 ft. - Surface Aggregate Missing, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
228.2 ft. - Surface Reinforcement Visible, from 10 to 11 o'clock, within 8 inches of joint: NO - CIRCUM REBAR
238 ft. - Surface Reinforcement Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM & LONG REBAR
265.4 ft. - Surface Aggregate Missing, from 03 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
588.2 ft. - General Observation - 90% MAGCOAT
| Distance | Code | Observation |
|---|---|---|
| 713.8 | AMH | 2:35AM |
| 37.8 | SRV | CIRCUM REBAR |
| 0 | MWL | — |
| 0 | MWM | — |
| 713.5 | SAM | SEVERE AGG UNDER MAG COAT |
| 2 | SAM | SEVERE AGG UNDER MAG |
| 238 | SRV | CIRCUM & LONG REBAR |
| 2 | MGO | MAG COAT 90% 8:00 TO 4:00 START |
| 265.4 | SAM | SEVERE AGG |
| 96.8 | SAM | SEVERE AGG |
| 228.2 | SRV | CIRCUM REBAR |
| 41.1 | SSS | FLACKING CONCRETE |
| 588.2 | MGO | 90% MAGCOAT |
| 713.5 | MGO | MAG COAT 90% FINISH |
| 0 | AMH | 1:30AM |