Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 31, 2017, 06:08 PM
  • 01 1123_01 1122_1312017_101154.mp4

Date
01/31/2017
W/O
0613635
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00210
PipeID
P01975
Time
10:08 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7321
Sewer Name
01 HUNTINGTON PARK TRUNK
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Capital Improvement Program Assesment
Project
20170127DF_HUNTINGTON_PARK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
01 1123
Downstream MH
01 1122
Dir. of Survey
Downstream
Length Surveyed
290.6 ft.
Total Length
290.6 ft.
Structural Index
3
Structural Quick
3622
Structural Rating
22
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
22
Pipe schematic from manhole 01 1123 to 01 1122
MH: 01 1123MH: 01 1122downstream0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 10:10 AM0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.1 ft. MGO - General Observation - GREASE/SPALLING8.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"23.5 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"29.1 ft. MGP - General Photograph - SPALLING42.8 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES51.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - OPEN52.7 ft. CM - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES59.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN/90% BLOCKED60.4 ft. CM - Crack Multiple, from 09 to 04 o'clock, within 8 inches of joint: YES107.2 ft. MGO - General Observation - GREASE FROM 3 TO 5 O'CLOCK110.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"127 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES139.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES145.8 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"168.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - OPEN176.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"212.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN247.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"252.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"288.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish288.7 ft. MGO - General Observation - ROACHES @ MH288.7 ft. MGO - General Observation - SLIGHT GREASE THROUGHOUT THE REACH288.7 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish288.7 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish290.6 ft. AMH - Downstream Manhole, Survey Ends - 10:48 AM

Observation photos (9)

  • General Observation - GREASE/SPALLING

    6.1 ft. - General Observation - GREASE/SPALLING

  • General Photograph - SPALLING

    29.1 ft. - General Photograph - SPALLING

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    42.8 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

    52.7 ft. - Crack Multiple, from 10 to 02 o'clock, within 8 inches of joint: YES

  • Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN/90% BLOCKED

    59.5 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4" - OPEN/90% BLOCKED

  • Crack Multiple, from 09 to 04 o'clock, within 8 inches of joint: YES

    60.4 ft. - Crack Multiple, from 09 to 04 o'clock, within 8 inches of joint: YES

  • General Observation - GREASE FROM 3 TO 5 O'CLOCK

    107.2 ft. - General Observation - GREASE FROM 3 TO 5 O'CLOCK

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    127 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    139.4 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (32)

DistanceCodeObservation
247.6TFA
0MGOROACHES @ MH
139.4CM
52.7CM
145.8TFA
290.6AMH10:48 AM
110.1TFA
0MWL
168.9TFOPEN
42.8CM
8.3TFA
288.7MGOROACHES @ MH
2CM
6.1MGOGREASE/SPALLING
0AMH10:10 AM
288.7MGOSLIGHT GREASE THROUGHOUT THE REACH
0MWM
176.2TFA
2SAVC
107.2MGOGREASE FROM 3 TO 5 O'CLOCK
23.5TFA
127CL
60.4CM
252.8TFA
212.2TFOPEN
51.4TFOPEN
288.7SAVC
29.1MGPSPALLING
288.7SSSC
2SSSC
59.5TFOPEN/90% BLOCKED
288.6CM

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-01-31T10:08:32-08:00