Wastewater/Activity/PacpInspection/1.0Jan 31, 2017, 05:24 PM
  • 01 1124_01 1123_1312017_092855.mp4

Date
01/31/2017
W/O
0613635
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00210
PipeID
P01976
Time
9:24 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7321
Sewer Name
01 HUNTINGTON PARK TRUNK
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Capital Improvement Program Assesment
Project
20170127DF_HUNTINGTON_PARK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
01 1124
Downstream MH
01 1123
Dir. of Survey
Downstream
Length Surveyed
281.6 ft.
Total Length
281.6 ft.
Structural Index
2
Structural Quick
3227
Structural Rating
20
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
20
Pipe schematic from manhole 01 1124 to 01 1123
MH: 01 1124MH: 01 1123downstream0 ft. AMH - Upstream Manhole, Survey Begins - 9:26 AM0 ft. MGO - General Observation - ROACHES @ MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6 ft. MGO - General Observation - CHIPPING @ 11 O'CLOCK7.8 ft. MGP - General Photograph - SPALLING 8 TO 4 O'CLOCK16.8 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4" - OPEN/INTRUDING 1"78.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4" - OPEN101.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 4" - OPEN127 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 4"134.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"134.9 ft. MGP - General Photograph - SPALLING140.9 ft. CS - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES143.4 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES156.1 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES180.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4"197 ft. MGP - General Photograph - GREASE198.3 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"228.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 4" - OPEN236.3 ft. TFA - Tap Factory Made Active, at 11 o'clock, -, within 8 inches of joint: YES, 4"248.9 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"262.1 ft. MGP - General Photograph - SPALLING265.5 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES275.5 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES278.2 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES279.6 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish279.6 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish279.6 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish281.6 ft. AMH - Downstream Manhole, Survey Ends - 10:04 AM281.6 ft. MGO - General Observation - ROACHES @ MH281.6 ft. MGO - General Observation - GREASE THROUGHOUT THE REACH

Observation photos (12)

  • General Observation - CHIPPING @ 11 O'CLOCK

    6 ft. - General Observation - CHIPPING @ 11 O'CLOCK

  • General Photograph - SPALLING 8 TO 4 O'CLOCK

    7.8 ft. - General Photograph - SPALLING 8 TO 4 O'CLOCK

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4" - OPEN/INTRUDING 1"

    16.8 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 4", 4" - OPEN/INTRUDING 1"

  • General Photograph - SPALLING

    134.9 ft. - General Photograph - SPALLING

  • Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES

    140.9 ft. - Crack Spiral, from 08 to 09 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    143.4 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    156.1 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • General Photograph - GREASE

    197 ft. - General Photograph - GREASE

  • General Photograph - SPALLING

    262.1 ft. - General Photograph - SPALLING

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    265.5 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    275.5 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

    278.2 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES

Observations (34)

DistanceCodeObservation
101.6TFOPEN
279.6CM
127TFA
279.6SAVC
0AMH9:26 AM
0MGOROACHES @ MH
236.3TFA
2SSSC
278.2CL
6MGOCHIPPING @ 11 O'CLOCK
281.6AMH10:04 AM
2CM
134.9MGPSPALLING
198.3TFA
156.1CL
16.8TBOPEN/INTRUDING 1"
281.6MGOROACHES @ MH
7.8MGPSPALLING 8 TO 4 O'CLOCK
140.9CS
78.5TFOPEN
275.5CL
134.7TFA
197MGPGREASE
0MWL
143.4CL
0MWM
2SAVC
281.6MGOGREASE THROUGHOUT THE REACH
248.9TFA
180.2TF
262.1MGPSPALLING
228.3TFOPEN
279.6SSSC
265.5CL

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2017-01-31T09:24:35-08:00