Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 30, 2017, 04:45 PM
  • 01 1087_01 1086_1302017_085921.mp4

Date
01/30/2017
W/O
0613635
Weather
Dry
Operator/Surveyor
FRANKLIN
Sewer ID
Z00210
PipeID
P01936
Time
8:45 AM
Certificate
U-415-06024039
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7320
Sewer Name
01 HUNTINGTON PARK TRUNK
City
HUNTINGTON PARK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
08
Purpose
Capital Improvement Program Assesment
Project
20170127DF_HUNTINGTON_PARK_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
01 1087
Downstream MH
01 1086
Dir. of Survey
Downstream
Length Surveyed
463.4 ft.
Total Length
463.4 ft.
Structural Index
3
Structural Quick
3824
Structural Rating
32
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
32
Pipe schematic from manhole 01 1087 to 01 1086
MH: 01 1087MH: 01 1086downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 8:46 AM0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MGO - General Observation - ROACHES @ MH2 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SZC - Surface Other Chemical, from 07 to 05 o'clock, within 8 inches of joint: YES, Start - GREASE @ JOINTS7.6 ft. CL - Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES26.8 ft. SSSC - Surface Spalling Chemical, from 07 to 05 o'clock, within 8 inches of joint: YES99.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN122.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - OPEN135.7 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES179.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"246.4 ft. MGP - General Photograph - SPALLING422.1 ft. CL - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES440.1 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start442.9 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES445.1 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish445.1 ft. FS - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES445.1 ft. FS - Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES, Start449.9 ft. MGP - General Photograph - CONTINUOUS FRACTURE458.2 ft. FS - Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES, Finish458.2 ft. CM - Crack Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES463.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active463.2 ft. MGO - General Observation - ROACHES @ MH463.2 ft. SZC - Surface Other Chemical, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish - GREASE @ JOINTS463.2 ft. MGO - General Observation - Conn. @ Mh, 5 O' Clock. Active463.3 ft. SSSC - Surface Spalling Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish463.3 ft. SAVC - Surface Aggregate Visible Chemical, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish463.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish463.4 ft. AMH - Downstream Manhole, Survey Ends - 9:48 AM

Observation photos (11)

  • Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES

    7.6 ft. - Crack Longitudinal, at 04 o'clock, within 8 inches of joint: YES

  • Surface Spalling Chemical, from 07 to 05 o'clock, within 8 inches of joint: YES

    26.8 ft. - Surface Spalling Chemical, from 07 to 05 o'clock, within 8 inches of joint: YES

  • General Photograph - SPALLING

    246.4 ft. - General Photograph - SPALLING

  • Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

    422.1 ft. - Crack Longitudinal, at 09 o'clock, within 8 inches of joint: YES

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    440.1 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    442.9 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

    445.1 ft. - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES

  • Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES, Start

    445.1 ft. - Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES, Start

  • General Photograph - CONTINUOUS FRACTURE

    449.9 ft. - General Photograph - CONTINUOUS FRACTURE

  • Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES, Finish

    458.2 ft. - Fracture Spiral, from 12 to 01 o'clock, within 8 inches of joint: YES, Finish

  • Crack Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES

    458.2 ft. - Crack Multiple, from 10 to 03 o'clock, within 8 inches of joint: YES

Observations (32)

DistanceCodeObservation
463.3SSSC
463.3SAVC
2SSSC
458.2FS
26.8SSSC
449.9MGPCONTINUOUS FRACTURE
2SAVC
122.2TFOPEN
463.2MGOConn. @ Mh, 3 O' Clock. Active
135.7CM
422.1CL
463.2MGOROACHES @ MH
445.1FL
246.4MGPSPALLING
463.3CM
0MWM
445.1FS
0AMH8:46 AM
0MWL
463.2SZCGREASE @ JOINTS
463.2MGOConn. @ Mh, 5 O' Clock. Active
442.9FL
2CM
445.1FS
179.2TFA
440.1FL
2SZCGREASE @ JOINTS
7.6CL
458.2CM
99.9TFOPEN
0MGOROACHES @ MH
463.4AMH9:48 AM

Properties (3)

custom_field_two
2
customer
LACSD
datetime
2017-01-30T08:45:04-08:00