Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 27, 2017, 11:26 AM
  • 03 0325_03 0324_1272017_033711.mp4

Date
01/27/2017
W/O
0619904
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00359
PipeID
P04899
Time
3:26 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0416
Sewer Name
03 ANAHEIM STREET TRUNK
City
LONG BEACH
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 03
Page No.
24
Purpose
Capital Improvement Program Assesment
Project
20170125MDM_ANAHEIM_STREET_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
03 0325
Downstream MH
03 0324
Dir. of Survey
Downstream
Length Surveyed
330.4 ft.
Total Length
330.4 ft.
Structural Index
3
Structural Quick
4221
Structural Rating
10
O&M Index
4
O&M Quick
4231
O&M Rating
11
Overall Index
4
Overall Quick
Overall Rating
21
Pipe schematic from manhole 03 0325 to 03 0324
MH: 03 0325MH: 03 0324downstream0 ft. MWL - Water Level, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:35AM0 ft. MWM - Water Mark, 70 %of cross sectional area2 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG53.1 ft. DSZ - Deposits Settled Other, 15 %of cross sectional area, from 03 to 06 o'clock, , within 8 inches of joint: YES - PIECE OFF PIPE WALL83.5 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG83.5 ft. MWM - Water Mark, 60 %of cross sectional area83.5 ft. SAM - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG83.5 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES - PEELING CONCRETE THROUGHOUT REACH330.1 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG330.4 ft. AMH - Downstream Manhole, Survey Ends - 4:05AM

Observation photos (4)

  • Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Deposits Settled Other,  15 %of cross sectional area, from 03 to 06 o'clock,  , within 8 inches of joint: YES - PIECE OFF PIPE WALL

    53.1 ft. - Deposits Settled Other, 15 %of cross sectional area, from 03 to 06 o'clock, , within 8 inches of joint: YES - PIECE OFF PIPE WALL

  • Water Mark, 60 %of cross sectional area

    83.5 ft. - Water Mark, 60 %of cross sectional area

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES - PEELING CONCRETE THROUGHOUT REACH

    83.5 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES - PEELING CONCRETE THROUGHOUT REACH

Observations (11)

DistanceCodeObservation
83.5SAMSEVERE AGG
83.5MWM
330.4AMH4:05AM
83.5SAMSEVERE AGG
2SAMSEVERE AGG
83.5SSSPEELING CONCRETE THROUGHOUT REACH
0MWL
53.1DSZPIECE OFF PIPE WALL
330.1SAMSEVERE AGG
0AMH3:35AM
0MWM

Properties (4)

custom_field_three
PEELING CONCRETE MISSING SEVERE AGG
custom_field_two
1
customer
LACSD
datetime
2017-01-27T03:26:51-08:00