Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 9, 2017, 10:07 AM
  • 05 0680_05 0679_192017_043149.mp4

  • 05 0680_05 0679_192017_023945.mp4

Date
01/09/2017
W/O
0607750
Weather
Heavy Rain
Operator/Surveyor
MARTIN
Sewer ID
Z00523
PipeID
P05912
Time
2:07 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0387
Sewer Name
05 SOUTH INGLEWOOD-ORANGE AVENUE TRUNK, EXTENSION #2
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
11
Purpose
Routine Assessment
Project
20170109MDM_SOUTH_INGLEWOOD_ORANGE_AVENUE_TRUNK_EXTENSION_2
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
05 0680
Downstream MH
05 0679
Dir. of Survey
Downstream
Length Surveyed
301.6 ft.
Total Length
301.6 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2700
O&M Rating
14
Overall Index
2
Overall Quick
Overall Rating
14
Pipe schematic from manhole 05 0680 to 05 0679
MH: 05 0680MH: 05 0679downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:30AM0 ft. MWL - Water Level, 20 %of cross sectional area27.2 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Active-60% ROOTS30.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open55.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open76.6 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Active-50% ROOTS113.7 ft. MGO - General Observation - INSPECTION CONTUNED 01/12/17(2:30AM)113.7 ft. MGO - General Observation - INSPECTION STOPPED RAIN HIGH FLOW114 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open116.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open157.5 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open-30%ROOTS160.2 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open-60% ROOTS188.5 ft. MGO - General Observation - 12" VCP194.1 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open-20% ROOTS197.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open206.4 ft. TFD - Tap Factory Made Defective, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open-40% ROOTS237.5 ft. TFD - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open-80% ROOTS274.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped277.6 ft. TB - Tap Break-In, at 12 o'clock, -, within 8 inches of joint: YES, 6" - OPEN301.6 ft. AMH - Downstream Manhole, Survey Ends - 2:50AM

Observation photos (1)

  • General Observation - 12" VCP

    188.5 ft. - General Observation - 12" VCP

Observations (21)

DistanceCodeObservation
274.8TFCCapped
237.5TFDOpen-80% ROOTS
206.4TFDOpen-40% ROOTS
188.5MGO12" VCP
157.5TFDOpen-30%ROOTS
197.1TFOpen
114TFOpen
0MWM
113.7MGOINSPECTION CONTUNED 01/12/17(2:30AM)
0AMH4:30AM
277.6TBOPEN
194.1TFDOpen-20% ROOTS
30.2TFOpen
76.6TFDActive-50% ROOTS
160.2TFDOpen-60% ROOTS
113.7MGOINSPECTION STOPPED RAIN HIGH FLOW
55.2TFOpen
0MWL
27.2TFDActive-60% ROOTS
116.9TFOpen
301.6AMH2:50AM

Properties (3)

custom_field_two
4
customer
LACSD
datetime
2017-01-09T02:07:32-08:00