Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Nov 23, 2016, 12:32 PM
  • 18 0209_18 0208_11232016_044344.mp4

Date
11/23/2016
W/O
0608983
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00695
PipeID
P14034
Time
4:32 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Heavy Cleaning
Media Label
H0354
Sewer Name
18 ORR AND DAY ROAD TRUNK
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
13
Purpose
Maintenance Related
Project
20161123MDM_ORR_AND_DAY_ROAD_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
18 0209
Downstream MH
18 0208
Dir. of Survey
Downstream
Length Surveyed
133.6 ft.
Total Length
133.6 ft.
Structural Index
2
Structural Quick
2100
Structural Rating
2
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole 18 0209 to 18 0208
MH: 18 0209MH: 18 0208downstream0 ft. AMH - Upstream Manhole, Survey Begins - 5:00AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 80 %of cross sectional area2 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE9.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start - ROCKS SLUDGE68.3 ft. MWM - Water Mark, 40 %of cross sectional area68.3 ft. MWL - Water Level, 30 %of cross sectional area133 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish - ROCKS SLUDGE133 ft. SSS - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE133.6 ft. AMH - Downstream Manhole, Survey Ends - 5:25AM

Observation photos (2)

  • Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Downstream Manhole, Survey Ends - 5:25AM

    133.6 ft. - Downstream Manhole, Survey Ends - 5:25AM

Observations (11)

DistanceCodeObservation
133.6AMH5:25AM
0AMH5:00AM
9.8DSZROCKS SLUDGE
0MGOConn. @ Mh, 3 O' Clock. Active
2SSSBLISTERING PEELING CONCRETE
68.3MWM
0MWM
133DSZROCKS SLUDGE
0MWL
68.3MWL
133SSSBLISTERING PEELING CONCRETE

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2016-11-23T04:32:38-08:00