Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 26, 2016, 09:25 AM
  • C 0667_C 0666_10262016_023752.mp4

Date
10/26/2016
W/O
0596966
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00266
PipeID
P23933
Time
2:25 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6750
Sewer Name
C JOINT OUTFALL C - UNIT 3F
City
SIGNAL HILL
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
20161026MDM_JOINT_OUTFALL_C_UNIT_3F
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
C 0666
Downstream MH
C 0667
Dir. of Survey
Upstream
Length Surveyed
280.6 ft.
Total Length
280.6 ft.
Structural Index
2
Structural Quick
322C
Structural Rating
48
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
48
Pipe schematic from manhole C 0666 to C 0667
MH: C 0666MH: C 0667upstream0 ft. AMH - Upstream Manhole, Survey Ends - 3:45AM0.5 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. OPEN20 ft. FC - Fracture Circumferential, from 10 to 01 o'clock, within 8 inches of joint: YES - H22.5 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - H35.6 ft. JOM - Joint Offset Medium40.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open43.6 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - H50.8 ft. FC - Fracture Circumferential, from 11 to 02 o'clock, within 8 inches of joint: YES - H59.9 ft. FC - Fracture Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES - SL71.5 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - H71.5 ft. FC - Fracture Circumferential, from 08 to 12 o'clock, within 8 inches of joint: YES - SL75.3 ft. FC - Fracture Circumferential, from 08 to 01 o'clock, within 8 inches of joint: YES - SL90.5 ft. FC - Fracture Circumferential, from 11 to 03 o'clock, within 8 inches of joint: YES - H94.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped124.7 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - H143.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped143.5 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - SL166.8 ft. FC - Fracture Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES - H182.9 ft. FC - Fracture Circumferential, from 12 to 02 o'clock, within 8 inches of joint: YES - H182.9 ft. FC - Fracture Circumferential, from 10 to 12 o'clock, within 8 inches of joint: YES - SL183.6 ft. MGO - General Observation - 12" VCP198.4 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - H199.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped206.9 ft. FL - Fracture Longitudinal, at 01 o'clock, within 8 inches of joint: YES - H213.7 ft. FC - Fracture Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES - SL225.7 ft. FC - Fracture Circumferential, from 10 to 01 o'clock, within 8 inches of joint: YES - SL231.7 ft. FC - Fracture Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES - SLIGHT240.7 ft. FC - Fracture Circumferential, from 10 to 03 o'clock, within 8 inches of joint: YES - H247 ft. JOM - Joint Offset Medium248.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped262.8 ft. FC - Fracture Circumferential, from 12 to 04 o'clock, within 8 inches of joint: YES - H272.7 ft. FC - Fracture Circumferential, from 08 to 02 o'clock, within 8 inches of joint: YES - HAIRLINE280.6 ft. AMH - Downstream Manhole, Survey Begins - 2:30AM280.6 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active280.6 ft. MWM - Water Mark, 20 %of cross sectional area280.6 ft. MWL - Water Level, 5 %of cross sectional area

Observation photos (4)

  • Joint Offset Medium

    33.6 ft. - Joint Offset Medium

  • General Observation - 12" VCP

    97 ft. - General Observation - 12" VCP

  • Joint Offset Medium

    245 ft. - Joint Offset Medium

  • Upstream Manhole, Survey Ends - 3:45AM

    280.6 ft. - Upstream Manhole, Survey Ends - 3:45AM

Observations (36)

DistanceCodeObservation
17.8FCH
245JOM
209.1FCH
66.9FCSL
113.8FCH
280.1MGOConn. @ Mh, 9 O' Clock. OPEN
137.1TFCCapped
54.9FCSL
0AMH2:30AM
0MGOConn. @ Mh, 3 O' Clock. Active
48.9FCSLIGHT
0MWM
137.1FCSL
97.7FCH
258.1FCH
239.7TFOpen
205.3FCSL
82.2FLH
237FCH
73.7FLH
190.1FCH
33.6JOM
280.6AMH3:45AM
209.1FCSL
81.1TFCCapped
32.4TFCCapped
7.9FCHAIRLINE
229.8FCH
97.7FCSL
185.7TFCCapped
155.9FCH
260.6FCH
39.9FCH
97MGO12" VCP
0MWL
220.7FCSL

Properties (5)

custom_field_three
FEW SLIOGHT FRACTURES
custom_field_two
4
customer
LACSD
datetime
2016-10-26T02:25:43-07:00
year_laid
20020814