Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 27, 2016, 09:31 AM
  • 16 0100_16 0099_10272016_041031.mp4

Date
10/27/2016
W/O
0596906
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00641
PipeID
P13138
Time
2:31 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6752
Sewer Name
16 ALLEN AVENUE TRUNK, SECTION 5
City
SAN MARINO
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 16
Page No.
14
Purpose
Routine Assessment
Project
20161025MDM_ALLEN_AVENUE_TRUNK_SECTION_5
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
16 0100
Downstream MH
16 0099
Dir. of Survey
Downstream
Length Surveyed
376.9 ft.
Total Length
376.9 ft.
Structural Index
3
Structural Quick
3421
Structural Rating
14
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
14
Pipe schematic from manhole 16 0100 to 16 0099
MH: 16 0100MH: 16 0099downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:55AM0 ft. MWM - Water Mark, 30 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING LAITANCE COAT2 ft. MGO - General Observation - 60%MAG COAT 8:00 TO4:00 START2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG26.1 ft. SAP - Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG48.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG183.4 ft. MGO - General Observation - MAG COAT 70% START189.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG376.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG376.3 ft. MGO - General Observation - MAG COAT 70% FINISH376.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING LAITANCE COAT376.9 ft. AMH - Downstream Manhole, Survey Ends - 4:30AM

Observation photos (7)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING LAITANCE COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING LAITANCE COAT

  • General Observation - 60%MAG COAT 8:00 TO4:00 START

    2 ft. - General Observation - 60%MAG COAT 8:00 TO4:00 START

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    2 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    26.1 ft. - Surface Aggregate Projecting, from 02 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    48.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • General Observation - MAG COAT 70% START

    183.4 ft. - General Observation - MAG COAT 70% START

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

    189.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (14)

DistanceCodeObservation
48.9SAPSEVERE AGG
2SSSPEELING LAITANCE COAT
2MGO60%MAG COAT 8:00 TO4:00 START
26.1SAPSEVERE AGG
189.9SAPSEVERE AGG
0MWL
376.3SAPSEVERE AGG
0AMH3:55AM
376.9AMH4:30AM
183.4MGOMAG COAT 70% START
376.3MGOMAG COAT 70% FINISH
376.3SSSPEELING LAITANCE COAT
2SAVSEVERE AGG
0MWM

Properties (4)

custom_field_three
PEELING THIN CONCRETE-PROJECTING SEVERE AGG
custom_field_two
3
customer
LACSD
datetime
2016-10-27T02:31:31-07:00