Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 20, 2016, 07:27 AM
  • 02 1819_02 1818_10202016_003712.mp4

Date
10/20/2016
W/O
0596932
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00236
PipeID
P04166
Time
12:27 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6741
Sewer Name
02 ATLANTIC AVENUE RELIEF TRUNK
City
LOS ANGLES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
12
Purpose
Routine Assessment
Project
20161020MDM_ATALANTIC_AVENUE_RELIEF_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
02 1819
Downstream MH
02 1818
Dir. of Survey
Downstream
Length Surveyed
351 ft.
Total Length
351 ft.
Structural Index
3
Structural Quick
4222
Structural Rating
12
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
12
Pipe schematic from manhole 02 1819 to 02 1818
MH: 02 1819MH: 02 1818downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:30AM2 ft. MGO - General Observation - MAG COAT 40% START 8:00 TO 4:002 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE-SEVERE AGG ATTACHEC2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG22.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE28.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG ON PEELING CONCRETE44.7 ft. MGO - General Observation - MAG COAT 20% START48.6 ft. MGP - General Photograph295.7 ft. MGO - General Observation - MAG COAT 50% START349.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE349.3 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG349.3 ft. MGO - General Observation - MAG COAT 50% FINISH351 ft. AMH - Downstream Manhole, Survey Ends - 1:05AM

Observation photos (8)

  • General Observation - MAG COAT 40% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 40% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE-SEVERE AGG ATTACHEC

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE-SEVERE AGG ATTACHEC

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

    22.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - PEELING CONCRETE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG ON PEELING CONCRETE

    28.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG ON PEELING CONCRETE

  • General Observation - MAG COAT 20% START

    44.7 ft. - General Observation - MAG COAT 20% START

  • General Photograph

    48.6 ft. - General Photograph

  • General Observation - MAG COAT 50% START

    295.7 ft. - General Observation - MAG COAT 50% START

Observations (15)

DistanceCodeObservation
0MWM
351AMH1:05AM
0MWL
2MGOMAG COAT 40% START 8:00 TO 4:00
44.7MGOMAG COAT 20% START
2SSSPEELING CONCRETE-SEVERE AGG ATTACHEC
28.4SAMSEVERE AGG ON PEELING CONCRETE
0AMH12:30AM
349.3SSSPEELING CONCRETE
2SAMSEVERE AGG
295.7MGOMAG COAT 50% START
349.3SAMSEVERE AGG
48.6MGP
22.9SSSPEELING CONCRETE
349.3MGOMAG COAT 50% FINISH

Properties (4)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
2
customer
LACSD
datetime
2016-10-20T00:27:39-07:00