Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 18, 2016, 12:13 PM
Date
10/18/2016
W/O
0596932
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00236
PipeID
P04169
Time
5:13 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6739
Sewer Name
02 ATLANTIC AVENUE RELIEF TRUNK
City
LOS ANGLES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
09
Purpose
Routine Assessment
Project
20161018MDM_ATALANTIC_AVENUE_RELIEF_TRUNK
Material
NRCP
Shape
Circular
Height
18 in.
Upstream MH
02 1822
Downstream MH
02 1821
Dir. of Survey
Downstream
Length Surveyed
293.9 ft.
Total Length
293.9 ft.
Structural Index
3
Structural Quick
4K2K
Structural Rating
354
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
354
Pipe schematic from manhole 02 1822 to 02 1821
MH: 02 1822MH: 02 1821downstream0 ft. MGO - General Observation - MH CONN ACTIVE 9:000 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:20AM0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE2 ft. MGO - General Observation - MAG COAT 70% START 8:00 TO 4:002 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG-PEELING CONCRETE40.3 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG79.4 ft. MGO - General Observation - MAG COAT 60% START199 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE293.5 ft. MGO - General Observation - MAG COAT 60% FINISH293.5 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG293.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE293.9 ft. AMH - Downstream Manhole, Survey Ends - 5:40AM

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

  • General Observation - MAG COAT 70% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 70% START 8:00 TO 4:00

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG-PEELING CONCRETE

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG-PEELING CONCRETE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    40.3 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

    199 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

Observations (14)

DistanceCodeObservation
293.5MGOMAG COAT 60% FINISH
293.9AMH5:40AM
0MGOMH CONN ACTIVE 9:00
199SSSPEELING CONCRETE
293.5SAMSEVERE AGG
2SSSPEELING CONCRETE
79.4MGOMAG COAT 60% START
2MGOMAG COAT 70% START 8:00 TO 4:00
293.5SSSPEELING CONCRETE
2SAMSEVERE AGG-PEELING CONCRETE
0MWL
40.3SAMSEVERE AGG
0AMH5:20AM
0MWM

Properties (4)

custom_field_three
PEELING CONCRETE - MISSING SEVERE AGG
custom_field_two
2
customer
LACSD
datetime
2016-10-18T05:13:46-07:00