2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG
2 ft. - General Observation - MAG COAT 60% START 8:00 TO 4:00
28.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE
97 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - PEELING CONCRETE
239.3 ft. - Deposits Settled Other, 5 %of cross sectional area, from 06 to 08 o'clock, , within 8 inches of joint: YES - PEELED CONCRETE AGG ATTACHED
261.3 ft. - General Observation - MAG COAT 25% START
| Distance | Code | Observation |
|---|---|---|
| 2 | SAP | SEVERE AGG |
| 2 | MGO | MAG COAT 60% START 8:00 TO 4:00 |
| 406.2 | MGO | MH CONN ACTIVE 9:00 |
| 28.9 | SSS | PEELING CONCRETE |
| 97 | SSS | PEELING CONCRETE |
| 406.2 | MGO | MAG COAT 25% FINISH |
| 406.2 | SAP | SEVERE AGG |
| 0 | AMH | 4:40AM |
| 239.3 | DSZ | PEELED CONCRETE AGG ATTACHED |
| 406.7 | AMH | 5:10AM |
| 0 | MWL | — |
| 0 | MWM | — |
| 261.3 | MGO | MAG COAT 25% START |
| 406.2 | SSS | PEELING CONCRETE |