Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 15, 2016, 08:28 AM
  • 22 0543_22 0542_10152016_060445.mp4

Date
10/15/2016
W/O
0591578
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00791
PipeID
P16885
Time
1:28 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
HO324
Sewer Name
22 BEN LOMOND TRUNK
City
COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
20
Purpose
Routine Assessment
Project
20161015MDM_BEN_LOMOND_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
22 0543
Downstream MH
22 0542
Dir. of Survey
Downstream
Length Surveyed
217.9 ft.
Total Length
217.9 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
2
Pipe schematic from manhole 22 0543 to 22 0542
MH: 22 0543MH: 22 0542downstream0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 6:10AM8 ft. MGO - General Observation - 8" VCP14.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start15.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped25 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open65 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open132.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active158.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open185.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open205 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open217.3 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active217.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish217.9 ft. AMH - Downstream Manhole, Survey Ends - 6:30AM

Observations (15)

DistanceCodeObservation
0MWM
205TFOpen
132.7TFActive
8MGO8" VCP
0MWL
217.9AMH6:30AM
217.3MGOConn. @ Mh, 3 O' Clock. Active
15.6TFCCapped
14.4DAGS
0AMH6:10AM
65TFOpen
158.8TFOpen
217.3DAGS
185.6TFOpen
25TFOpen

Properties (3)

custom_field_two
4
customer
LACSD
datetime
2016-10-15T01:28:29-07:00