Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 4, 2016, 09:01 AM
  • C 0660_C 0659_1042016_035033.mp4

Date
10/04/2016
W/O
0596966
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00266
PipeID
P23926
Time
2:01 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0308
Sewer Name
C JOINT OUTFALL C - UNIT 3F
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
01
Purpose
Routine Assessment
Project
20161004MDM_JOINT_OUTFALL_C_UNIT_3F
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
C 0659
Downstream MH
C 0660
Dir. of Survey
Upstream
Length Surveyed
331 ft.
Total Length
331 ft.
Structural Index
2
Structural Quick
3325
Structural Rating
19
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
19
Pipe schematic from manhole C 0659 to C 0660
MH: C 0659MH: C 0660upstream0 ft. AMH - Upstream Manhole, Survey Ends - 4:15AM11 ft. FC - Fracture Circumferential, from 08 to 10 o'clock, within 8 inches of joint: YES - S11 ft. FC - Fracture Circumferential, from 03 to 04 o'clock, within 8 inches of joint: YES - H52.2 ft. FL - Fracture Longitudinal, at 10 o'clock, within 8 inches of joint: YES - H61 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped80.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped110.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Active113 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped132.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped142.8 ft. MGO - General Observation - 18" VCP164.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped171.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped182.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped190.6 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: NO, 6" - Active231 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Capped233.6 ft. FL - Fracture Longitudinal, at 09 o'clock, within 8 inches of joint: YES - H250.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped261.7 ft. FL - Fracture Longitudinal, at 03 o'clock, within 8 inches of joint: YES - H261.7 ft. FC - Fracture Circumferential, from 11 to 02 o'clock, within 8 inches of joint: YES - H282.2 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - SLIGHT282.2 ft. FC - Fracture Circumferential, from 08 to 12 o'clock, within 8 inches of joint: YES - HAIRLINE283.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open297.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped331 ft. MWM - Water Mark, 30 %of cross sectional area331 ft. MWL - Water Level, 10 %of cross sectional area331 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN331 ft. AMH - Downstream Manhole, Survey Begins - 3:45AM

Observations (27)

DistanceCodeObservation
220.8TBActive
0MWM
148.1TFCCapped
48.8FCSLIGHT
140.4TBActive
0MWL
159.7TFCapped
198.7TFCCapped
188.2MGO18" VCP
97.4FLH
48.8FCHAIRLINE
218TFCCapped
331AMH4:15AM
320FCS
320FCH
47.5TFOpen
69.3FLH
0MGOConn. @ Mh, 3 O' Clock. OPEN
80.3TFCCapped
33.1TFCCapped
166.8TFCCapped
0AMH3:45AM
250.2TFCCapped
69.3FCH
270TFCCapped
100TFCCapped
278.8FLH

Properties (5)

custom_field_three
2 SLIGHT FRACTURES
custom_field_two
4
customer
LACSD
datetime
2016-10-04T02:01:20-07:00
year_laid
20020814