Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 30, 2016, 09:56 AM
  • 08 0312_08 0311_9302016_025931.mp4

Date
09/30/2016
W/O
0591702
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00013
PipeID
P00359
Time
2:56 AM
Certificate
101406022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0300
Sewer Name
08 KEYSTONE TRUNK
City
CARSON
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
10
Purpose
Capital Improvement Program Assesment
Project
20160930MDM_KEYSTONE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
08 0312
Downstream MH
08 0311
Dir. of Survey
Downstream
Length Surveyed
280.7 ft.
Total Length
280.7 ft.
Structural Index
2
Structural Quick
3829
Structural Rating
42
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
42
Pipe schematic from manhole 08 0312 to 08 0311
MH: 08 0312MH: 08 0311downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:00AM0 ft. MWL - Water Level, 10 %of cross sectional area5.7 ft. FC - Fracture Circumferential, from 10 to 02 o'clock, within 8 inches of joint: YES - HAIRLINE8.1 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open10 ft. FC - Fracture Circumferential, from 08 to 09 o'clock, within 8 inches of joint: YES - H10 ft. FC - Fracture Circumferential, from 11 to 01 o'clock, within 8 inches of joint: YES - H13.9 ft. FC - Fracture Circumferential, from 03 to 04 o'clock, within 8 inches of joint: YES - H13.9 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES - H15.9 ft. FS - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - S15.9 ft. FS - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - S20.3 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - SLIGHT20.3 ft. FC - Fracture Circumferential, from 12 to 02 o'clock, within 8 inches of joint: YES - H20.3 ft. FC - Fracture Circumferential, from 08 to 11 o'clock, within 8 inches of joint: YES - H22.5 ft. FL - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES, Start - SLIGHT AT JOINTS22.5 ft. FL - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES, Start - HAIRLINE AT JOINTS22.5 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SLIGHT AT JOINTS22.5 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - HAIRLINE AT JOINTS44.3 ft. FL - Fracture Longitudinal, at 04 o'clock, within 8 inches of joint: YES, Start - H49.2 ft. FL - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES, Finish - H68.7 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped116.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped141.9 ft. FS - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES, Finish - S141.9 ft. FS - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES, Finish - SLIGHT141.9 ft. FS - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - H141.9 ft. FS - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - H170.9 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped221.3 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Open264.3 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 6" - Capped280.3 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active280.3 ft. FS - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES, Finish - H280.3 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 10% SLIGHT280.3 ft. FC - Fracture Circumferential, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - 30% HAIRLINE280.3 ft. FL - Fracture Longitudinal, at 04 o'clock, within 8 inches of joint: YES, Finish - 10% SLIGHT280.3 ft. FS - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES, Finish - H280.3 ft. FL - Fracture Longitudinal, at 08 o'clock, within 8 inches of joint: YES, Finish - 30% HAIRLINE280.7 ft. AMH - Downstream Manhole, Survey Ends - 3:35AM

Observation photos (2)

  • Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - S

    15.9 ft. - Fracture Spiral, from 08 to 10 o'clock, within 8 inches of joint: YES, Start - S

  • Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - S

    15.9 ft. - Fracture Spiral, from 02 to 04 o'clock, within 8 inches of joint: YES, Start - S

Observations (37)

DistanceCodeObservation
0MWM
22.5FLSLIGHT AT JOINTS
13.9FCH
5.7FCHAIRLINE
116.9TFCCapped
280.3MGOConn. @ Mh, 3 O' Clock. Active
10FCH
22.5FLHAIRLINE AT JOINTS
141.9FSS
280.3FSH
141.9FSSLIGHT
15.9FSS
20.3FCSLIGHT
141.9FSH
22.5FCSLIGHT AT JOINTS
44.3FLH
280.3FC10% SLIGHT
280.3FC30% HAIRLINE
49.2FLH
280.3FL10% SLIGHT
10FCH
20.3FCH
8.1TFOpen
0AMH3:00AM
280.3FSH
170.9TFCCapped
22.5FCHAIRLINE AT JOINTS
264.3TFCCapped
13.9FLH
68.7TFCCapped
20.3FCH
280.3FL30% HAIRLINE
221.3TFOpen
280.7AMH3:35AM
141.9FSH
0MWL
15.9FSS

Properties (4)

custom_field_three
SLIGHT SPRIAL FRACTURE JOINT TO JOINT LONGER
custom_field_two
2
customer
LACSD
datetime
2016-09-30T02:56:12-07:00