Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 28, 2016, 07:45 AM
  • H 0405_A 0930_9282016_021312.mp4

Date
09/28/2016
W/O
0598765
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00956
PipeID
P21182
Time
12:45 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0296
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INFLUENT SEWER
City
WHITTIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
01
Purpose
Routine Assessment
Project
20160928MDM_JOA_1A_SAN_JOSE_CREEK_WRP_INFLUENT_SEWER
Material
Reinforced Concrete Pipe
Shape
Circular
Height
78 in.
Upstream MH
H 0405
Downstream MH
A 0930
Dir. of Survey
Downstream
Length Surveyed
614.2 ft.
Total Length
614.2 ft.
Structural Index
4
Structural Quick
5E44
Structural Rating
197
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
201
Pipe schematic from manhole H 0405 to A 0930
MH: H 0405MH: A 0930downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 40 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:55AM10 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG FRIST 2'10 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, - CIRCUM REBAR SPORATIC10 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING-PEELING CONCRETE12.5 ft. SAM - Surface Aggregate Missing, at 02 o'clock, within 8 inches of joint: YES - SEVERE AGG15.8 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM15.8 ft. SRV - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES, Start - LONG REBAR20 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - CIRCUM LONG REBAR22.9 ft. SRC - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM25.3 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG AROUNG JOINT25.3 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC31.2 ft. SRV - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Finish - CIRCUM31.2 ft. SRV - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES, Finish - LONG31.2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC38.3 ft. SRV - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM38.3 ft. SAV - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG45.6 ft. SAM - Surface Aggregate Missing, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG53.1 ft. SAV - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG53.1 ft. SAV - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG59.5 ft. SAP - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG59.5 ft. SAV - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG67.1 ft. SAV - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG67.1 ft. SAV - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG75.2 ft. SAV - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AT JOINTS75.2 ft. SAV - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AT JOINTS88.7 ft. SRC - Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM95.1 ft. SRC - Surface Reinforcement Corroded, at 10 o'clock, within 8 inches of joint: YES - CIRCUM101.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open101.7 ft. SRV - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM101.7 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - SEVERE AGG130 ft. SRV - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM130 ft. SRV - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM172.5 ft. SRV - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM179.6 ft. SRV - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM186.9 ft. SRV - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM200.7 ft. SAM - Surface Aggregate Missing, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG222.2 ft. SRV - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM263.3 ft. SRV - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM263.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 12" - Capped266.5 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: YES, 12" - Capped266.5 ft. SRV - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM270.9 ft. SRV - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM278.5 ft. SRV - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM278.5 ft. SRV - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM293.3 ft. SRV - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM319.6 ft. SRC - Surface Reinforcement Corroded, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM391.1 ft. SRV - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM448.6 ft. SRV - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM477.2 ft. SRV - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM550.1 ft. SAM - Surface Aggregate Missing, from 09 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG583.7 ft. SRV - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM590.7 ft. SRV - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: YES - CIRCUM594.9 ft. SRC - Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM600.5 ft. SAV - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG600.5 ft. SAV - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG600.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE613.4 ft. MGO - General Observation - LINER614.2 ft. AMH - Downstream Manhole, Survey Ends - 4:10AM

Observation photos (42)

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG FRIST 2'

    10 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG FRIST 2'

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES,  - CIRCUM REBAR SPORATIC

    10 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, - CIRCUM REBAR SPORATIC

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING-PEELING CONCRETE

    10 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - BLISTERING-PEELING CONCRETE

  • Surface Aggregate Missing, at 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

    12.5 ft. - Surface Aggregate Missing, at 02 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM

    15.8 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - CIRCUM

  • Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES, Start - LONG REBAR

    15.8 ft. - Surface Reinforcement Visible, at 12 o'clock, within 8 inches of joint: YES, Start - LONG REBAR

  • Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - CIRCUM LONG REBAR

    20 ft. - Surface Reinforcement Visible, from 10 to 02 o'clock, within 8 inches of joint: YES - CIRCUM LONG REBAR

  • Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM

    22.9 ft. - Surface Reinforcement Corroded, from 11 to 01 o'clock, within 8 inches of joint: NO - CIRCUM

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG AROUNG JOINT

    25.3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG AROUNG JOINT

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    25.3 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM

    38.3 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

    38.3 ft. - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Missing, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

    45.6 ft. - Surface Aggregate Missing, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

    59.5 ft. - Surface Aggregate Projecting, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

    59.5 ft. - Surface Aggregate Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

    67.1 ft. - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AT JOINTS

    75.2 ft. - Surface Aggregate Visible, from 09 to 10 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG AT JOINTS

  • Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM

    88.7 ft. - Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Corroded, at 10 o'clock, within 8 inches of joint: YES - CIRCUM

    95.1 ft. - Surface Reinforcement Corroded, at 10 o'clock, within 8 inches of joint: YES - CIRCUM

  • Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open

    101.7 ft. - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open

  • Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM

    101.7 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM

    130 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM

    130 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM

    172.5 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM

    179.6 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM

    186.9 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Aggregate Missing, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

    200.7 ft. - Surface Aggregate Missing, from 09 to 10 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM

    222.2 ft. - Surface Reinforcement Visible, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM

    263.3 ft. - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM

    266.5 ft. - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM

    270.9 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM

    278.5 ft. - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM

    278.5 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM

    293.3 ft. - Surface Reinforcement Visible, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Corroded, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM

    319.6 ft. - Surface Reinforcement Corroded, from 09 to 10 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM

    391.1 ft. - Surface Reinforcement Visible, at 10 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM

    477.2 ft. - Surface Reinforcement Visible, from 09 to 11 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Aggregate Missing, from 09 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG

    550.1 ft. - Surface Aggregate Missing, from 09 to 12 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM

    583.7 ft. - Surface Reinforcement Visible, at 02 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: YES - CIRCUM

    590.7 ft. - Surface Reinforcement Visible, from 01 to 02 o'clock, within 8 inches of joint: YES - CIRCUM

  • Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM

    594.9 ft. - Surface Reinforcement Corroded, from 02 to 03 o'clock, within 8 inches of joint: YES - CIRCUM

  • General Observation - LINER

    613.4 ft. - General Observation - LINER

Observations (60)

DistanceCodeObservation
10SAVSEVERE AGG FRIST 2'
448.6SRVCIRCUM
10SRVCIRCUM REBAR SPORATIC
270.9SRVCIRCUM
31.2SRVCIRCUM
101.7TFOpen
31.2SRVLONG
75.2SAVSEVERE AGG AT JOINTS
10SSSBLISTERING-PEELING CONCRETE
293.3SRVCIRCUM
20SRVCIRCUM LONG REBAR
0MWM
179.6SRVCIRCUM
101.7SRVCIRCUM
0MWL
590.7SRVCIRCUM
67.1SAVSEVERE AGG
25.3SAVSEVERE AGG AROUNG JOINT
59.5SAPSEVERE AGG
59.5SAVSEVERE AGG
25.3SAVSEVERE AGG SPORATIC
477.2SRVCIRCUM
38.3SRVCIRCUM
600.5SAVSEVERE AGG
278.5SRVCIRCUM
67.1SAVSEVERE AGG
130SRVCIRCUM
15.8SRVCIRCUM
263.3SRVCIRCUM
263.3TFCCapped
266.5TFCCapped
600.5SAVSEVERE AGG
38.3SAVSEVERE AGG
278.5SRVCIRCUM
172.5SRVCIRCUM
266.5SRVCIRCUM
222.2SRVCIRCUM
45.6SAMSEVERE AGG
583.7SRVCIRCUM
75.2SAVSEVERE AGG AT JOINTS
186.9SRVCIRCUM
31.2SAVSEVERE AGG SPORATIC
0AMH1:55AM
594.9SRCCIRCUM
12.5SAMSEVERE AGG
22.9SRCCIRCUM
614.2AMH4:10AM
319.6SRCCIRCUM
550.1SAMSEVERE AGG
95.1SRCCIRCUM
101.7SAVSEVERE AGG
53.1SAVSEVERE AGG
600.5SSSBLISTERING PEELING CONCRETE
88.7SRCCIRCUM
613.4MGOLINER
200.7SAMSEVERE AGG
130SRVCIRCUM
391.1SRVCIRCUM
15.8SRVLONG REBAR
53.1SAVSEVERE AGG

Properties (4)

custom_field_three
CORRODED REBAR CIRCUM-VISIBLE LONG REBAR
custom_field_two
2
customer
LACSD
datetime
2016-09-28T00:45:40-07:00