Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 26, 2016, 08:52 AM
  • 19 0240_19 0239_9262016_031518.mp4

Date
09/26/2016
W/O
0585465
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00728
PipeID
P15210
Time
1:52 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7241
Sewer Name
19 STUDEBAKER ROAD TRUNK
City
CERRITOS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
20160926MDM_STUDEBAKER_ROAD_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
19 0239
Downstream MH
19 0240
Dir. of Survey
Upstream
Length Surveyed
350.2 ft.
Total Length
350.2 ft.
Structural Index
2
Structural Quick
2200
Structural Rating
4
O&M Index
3
O&M Quick
3200
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 19 0239 to 19 0240
MH: 19 0239MH: 19 0240upstream0 ft. AMH - Downstream Manhole, Survey Ends - 3:35AM32.5 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 12 to 03 o'clock, , within 8 inches of joint: YES32.5 ft. TBD - Tap Break-In Defective, at 02 o'clock, -, , within 8 inches of joint: YES, 6" - OPEN 100% BLOCKED GREASE80.8 ft. MWL - Water Level, 15 %of cross sectional area80.8 ft. MWM - Water Mark, 30 %of cross sectional area80.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped134.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped161.8 ft. FC - Fracture Circumferential, from 08 to 09 o'clock, within 8 inches of joint: YES - H181.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Capped189.1 ft. MWL - Water Level, 5 %of cross sectional area235.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped289.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped292.7 ft. FC - Fracture Circumferential, from 02 to 04 o'clock, within 8 inches of joint: YES - HAIRLINE337 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped342.2 ft. MGO - General Observation - 15" VCP350.2 ft. MWM - Water Mark, 20 %of cross sectional area350.2 ft. MWL - Water Level, 10 %of cross sectional area350.2 ft. AMH - Downstream Manhole, Survey Begins - 2:55AM350.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active

Observation photos (4)

  • General Observation - 15" VCP

    8 ft. - General Observation - 15" VCP

  • Water Level, 5 %of cross sectional area

    161.1 ft. - Water Level, 5 %of cross sectional area

  • Deposits Attached Grease, 15 %of cross sectional area, from 12 to 03 o'clock,  , within 8 inches of joint: YES

    317.7 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 12 to 03 o'clock, , within 8 inches of joint: YES

  • Tap Break-In Defective, at 02 o'clock, -,  , within 8 inches of joint: YES, 6" - OPEN 100% BLOCKED GREASE

    317.7 ft. - Tap Break-In Defective, at 02 o'clock, -, , within 8 inches of joint: YES, 6" - OPEN 100% BLOCKED GREASE

Observations (19)

DistanceCodeObservation
269.4MWL
0MWM
0MWL
60.8TFCCapped
269.4MWM
168.4TFCCapped
114.7TFCCapped
215.9TFCCapped
350.2AMH3:35AM
0AMH2:55AM
0MGOConn. @ Mh, 3 O' Clock. Active
8MGO15" VCP
317.7DAGS
188.4FCH
13.2TFCCapped
317.7TBDOPEN 100% BLOCKED GREASE
161.1MWL
57.5FCHAIRLINE
269.4TFCCapped

Properties (4)

custom_field_three
HAIRLINE FRACTURES
custom_field_two
4
customer
LACSD
datetime
2016-09-26T01:52:40-07:00