- Date
- 09/17/2016
- W/O
- 0585473
- Weather
- Dry
- Operator/Surveyor
- REVELES
- Sewer ID
- Z00457
- PipeID
- P06074
- Time
- 7:20 AM
- Certificate
- U-115-06022630
- System Owner
- LACSD
- Date Cleaned
- —
- Pre-Cleaning
- Not Known
- Media Label
- H0283
- Sewer Name
- 05 IMPERIAL HIGHWAY EXTENSION TRUNK
- City
- LENNOX
- Loc. details
- Main Highway - Urban
- Location Code
- A
- Use of Sewer
- Sanitary Sewer
- District
- District 05
- Page No.
- 10
- Purpose
- Routine Assessment
- Project
- 20160917RO_IMPERIAL_HIGHWAY_EXTENSION_TRUNK
- Material
- Vitrified Clay Pipe
- Shape
- Circular
- Height
- 12 in.
- Upstream MH
- 05 0844
- Downstream MH
- 05 0843
- Dir. of Survey
- Downstream
- Length Surveyed
- 347.9 ft.
- Total Length
- 347.9 ft.
- Structural Index
- 2
- Structural Quick
- 3224
- Structural Rating
- 24
- O&M Index
- 2
- O&M Quick
- 3111
- O&M Rating
- 4
- Overall Index
- 2
- Overall Quick
- —
- Overall Rating
- 28
Pipe schematic from manhole 05 0844 to 05 0843 Observation photos (4)

57.6 ft. - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 4"

166.7 ft. - Roots Medium Joint, from 02 to 03 o'clock, 5 %, within 8 inches of joint: YESR

190.5 ft. - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4"

324.1 ft. - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 4"