Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Sep 16, 2016, 07:53 AM
  • 19 0242_19 0241_9162016_025715.mp4

Date
09/16/2016
W/O
0585465
Weather
Dry
Operator/Surveyor
REVELES
Sewer ID
Z00728
PipeID
P15212
Time
12:53 AM
Certificate
U-115-06022630
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0280
Sewer Name
19 STUDEBAKER ROAD TRUNK
City
CERRITOS
Loc. details
Ditch
Location Code
I
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
04
Purpose
Routine Assessment
Project
20160916VMR_STUDEBAKER_ROAD_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
19 0242
Downstream MH
19 0241
Dir. of Survey
Downstream
Length Surveyed
288.3 ft.
Total Length
288.3 ft.
Structural Index
2
Structural Quick
2811
Structural Rating
17
O&M Index
2
O&M Quick
412D
O&M Rating
50
Overall Index
2
Overall Quick
Overall Rating
67
Pipe schematic from manhole 19 0242 to 19 0241
MH: 19 0242MH: 19 0241downstream0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02:40 AM0 ft. MWL - Water Level, 30 %of cross sectional area7.5 ft. CC - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: NO9.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 10 o'clock, , within 8 inches of joint: YES11.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 10 o'clock, , within 8 inches of joint: YES16.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 10 o'clock, , within 8 inches of joint: YES20.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 09 o'clock, , within 8 inches of joint: NO20.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 03 o'clock, , within 8 inches of joint: NO29.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES29.3 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES41.9 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES41.9 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES41.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 12 to 02 o'clock, , within 8 inches of joint: YES48.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES54.6 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES54.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES54.6 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES60.9 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES64.4 ft. DAZ - Deposits Attached Other, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES - CALCIUM72.1 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 09 to 12 o'clock, , within 8 inches of joint: YES - CALIUM DEPOSIT84.7 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES98.1 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start128.1 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES133.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 04 o'clock, , within 8 inches of joint: YES139.4 ft. DAZ - Deposits Attached Other, 10 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES146.4 ft. CL - Crack Longitudinal, at 11 o'clock, within 8 inches of joint: YES146.4 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 10 to 11 o'clock, , within 8 inches of joint: YES165 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 01 to 02 o'clock, , within 8 inches of joint: YES182.3 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 01 to 02 o'clock, , within 8 inches of joint: YES214.1 ft. DAR - Deposits Attached Ragging, 5 %of cross sectional area, from 02 to 03 o'clock, , within 8 inches of joint: YES233 ft. DAZ - Deposits Attached Other, 10 %of cross sectional area, from 02 to 03 o'clock, , within 8 inches of joint: YES240.2 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 09 to 10 o'clock, , within 8 inches of joint: YES281.4 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 02 to 03 o'clock, , within 8 inches of joint: YES - CALCIUM287.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, at 03 o'clock, , within 8 inches of joint: YES287.3 ft. DAZ - Deposits Attached Other, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish288.3 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 10"288.3 ft. AMH - Downstream Manhole, Survey Ends - 03:48 AM

Observation photos (6)

  • Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: NO

    7.5 ft. - Crack Circumferential, from 09 to 03 o'clock, within 8 inches of joint: NO

  • Deposits Attached Grease, 5 %of cross sectional area, from 09 to 10 o'clock,  , within 8 inches of joint: YES

    9.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 10 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Other, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES - CALCIUM

    64.4 ft. - Deposits Attached Other, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES - CALCIUM

  • Deposits Attached Grease, 5 %of cross sectional area, from 09 to 04 o'clock,  , within 8 inches of joint: YES

    133.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 09 to 04 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Other, 10 %of cross sectional area, from 09 to 11 o'clock,  , within 8 inches of joint: YES

    139.4 ft. - Deposits Attached Other, 10 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES

  • Deposits Attached Other, 5 %of cross sectional area, from 01 to 02 o'clock,  , within 8 inches of joint: YES

    182.3 ft. - Deposits Attached Other, 5 %of cross sectional area, from 01 to 02 o'clock, , within 8 inches of joint: YES

Observations (38)

DistanceCodeObservation
64.4DAZCALCIUM
146.4CL
54.6CL
41.9CL
41.9CL
60.9CL
84.7CL
29.3DAGS
41.9DAGS
98.1DAZ
11.8DAGS
214.1DAR
0MWM
287.3DAZ
16.8DAGS
48.6DAGS
0AMH02:40 AM
20.1DAGS
7.5CC
182.3DAZ
29.3CL
139.4DAZ
288.3TFA
146.4DAZ
281.4DAZCALCIUM
20.1DAGS
54.6DAGS
128.1DAZ
165DAZ
0MWL
288.3AMH03:48 AM
9.3DAGS
72.1DAZCALIUM DEPOSIT
133.3DAGS
287.1DAGS
233DAZ
54.6CL
240.2DAZ

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2016-09-16T00:53:32-07:00