Date 09/09/2016
W/O 0585471
Weather Dry
Operator/Surveyor MIRANDA
Sewer ID Z00457
PipeID P20851
Time 1:33 PM
Certificate U-1014-06022542
System Owner LACSD
Date Cleaned —
Pre-Cleaning Not Known
Media Label G7228
Sewer Name 05 IMPERIAL HIGHWAY EXTENSION TRUNK
City INGLEWOOD
Loc. details Main Highway - Urban
Location Code A
Use of Sewer Sanitary Sewer
District District 05
Page No. 09
Purpose Routine Assessment
Project 20160909AM_IMPERIAL_HIGHWAY_EXTENSION_TRUNK
Material Vitrified Clay Pipe
Shape Circular
Height 12 in.
Upstream MH 05 2456
Downstream MH 05 2455
Dir. of Survey Downstream
Length Surveyed 224.8 ft.
Total Length 224.8 ft.
Structural Index 2
Structural Quick 2200
Structural Rating 4
O&M Index 2
O&M Quick 2200
O&M Rating 4
Overall Index 2
Overall Quick —
Overall Rating 8 Pipe schematic from manhole 05 2456 to 05 2455 MH: 05 2456 MH: 05 2455 downstream 0 ft. AMH - Upstream Manhole, Survey Begins - 1:33 PM 0 ft. MGO - General Observation - ROACHES INSIDE THE MH. 0 ft. MWL - Water Level, 35 %of cross sectional area 0 ft. MWM - Water Mark, 45 %of cross sectional area 2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - POSSIBLE SCALE/CALCIUM/DEBRIS 111.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - POSSIBLE SCALE/CALCIUM/DEBRIS 185.9 ft. JSL - Joint Separated Large 203.9 ft. JSL - Joint Separated Large 210 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - POSSIBLE SCALE/CALCIUM/DEBRIS 224 ft. MGO - General Observation - SAGS THROUGHOUT THE REACH 224 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - POSSIBLE SCALE/CALCIUM/DEBRIS 224.2 ft. MGO - General Observation - ROACHES INSIDE THE MH. 224.6 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK 224.6 ft. MGO - General Observation - UNKNOWN CONN. INSIDE THE MH. @ 07 O'CLOCK 224.8 ft. AMH - Downstream Manhole, Survey Ends - 1:54 PM Observation photos (5) 2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - POSSIBLE SCALE/CALCIUM/DEBRIS
111.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - POSSIBLE SCALE/CALCIUM/DEBRIS
185.9 ft. - Joint Separated Large
203.9 ft. - Joint Separated Large
210 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - POSSIBLE SCALE/CALCIUM/DEBRIS