Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 30, 2016, 12:24 PM
  • 19 0252_19 0251_8302016_054254.mp4

Date
08/30/2016
W/O
0585465
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00728
PipeID
P15222
Time
5:24 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0261
Sewer Name
19 STUDEBAKER ROAD TRUNK
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
01
Purpose
Routine Assessment
Project
20160829MDM_STUDEBAKER_ROAD_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
15 in.
Upstream MH
19 0252
Downstream MH
19 0251
Dir. of Survey
Downstream
Length Surveyed
155.2 ft.
Total Length
155.2 ft.
Structural Index
2
Structural Quick
2111
Structural Rating
3
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
2
Overall Quick
Overall Rating
5
Pipe schematic from manhole 19 0252 to 19 0251
MH: 19 0252MH: 19 0251downstream0 ft. AMH - Upstream Manhole, Survey Begins - 5:40AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 04 o'clock, , within 8 inches of joint: YES4 ft. CC - Crack Circumferential, from 02 to 03 o'clock, within 8 inches of joint: YES94.3 ft. MGO - General Observation - 15" VCP94.3 ft. FC - Fracture Circumferential, from 12 to 03 o'clock, within 8 inches of joint: YES - HAIRLINE155 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active155.2 ft. AMH - Downstream Manhole, Survey Ends - 5:55AM

Observation photos (1)

  • General Observation - 15" VCP

    94.3 ft. - General Observation - 15" VCP

Observations (9)

DistanceCodeObservation
94.3MGO15" VCP
155.2AMH5:55AM
0AMH5:40AM
155MGOConn. @ Mh, 9 O' Clock. Active
4CC
3DAGS
94.3FCHAIRLINE
0MWL
0MWM

Properties (3)

custom_field_two
4
customer
LACSD
datetime
2016-08-30T05:24:28-07:00