Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 28, 2016, 02:28 PM
  • 19 0042_19 0041_8282016_073550.mp4

Date
08/28/2016
W/O
0585475
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00725
PipeID
P15072
Time
7:28 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7216
Sewer Name
19 FULLERTON ROAD TRUNK
City
LONG BEACH
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
09
Purpose
Routine Assessment
Project
20160828AM_FULLERTON_ROAD_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Upstream MH
19 0041
Downstream MH
19 0042
Dir. of Survey
Upstream
Length Surveyed
273.9 ft.
Total Length
273.9 ft.
Structural Index
3
Structural Quick
513B
Structural Rating
57
O&M Index
2
O&M Quick
2B00
O&M Rating
28
Overall Index
2
Overall Quick
Overall Rating
85
Pipe schematic from manhole 19 0041 to 19 0042
MH: 19 0041MH: 19 0042upstream0 ft. AMH - Upstream Manhole, Survey Ends - 8:19 AM0.6 ft. MGO - General Observation - ROACHES INSIDE THE MH.0.6 ft. MGO - General Observation - UNKNOWN DROP CONN. INSIDE THE MH. @ 09 O'CLOCK0.9 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area, Finish0.9 ft. MGO - General Observation - SLIGHT GREASE THROUGHOUT THE REACH0.9 ft. DAE - Deposits Attached Encrustation, 5 % TO 10 % of cross sectional area, from 02 to 03 o'clock, , within 8 inches of joint: NO5.9 ft. FL - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES16.1 ft. MWLS - Water Level, Sag in pipe, 50 %of cross sectional area, Change26.7 ft. MWLS - Water Level, Sag in pipe, 35 %of cross sectional area, Change29.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"31 ft. JOL - Joint Offset Large36 ft. CM - Crack Multiple, from 10 to 01 o'clock, within 8 inches of joint: YES36 ft. DAE - Deposits Attached Encrustation, 5 % TO 10 % of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES37.3 ft. MWLS - Water Level, Sag in pipe, 30 %of cross sectional area, Start - POSSIBLE DEBRIS OR ANGLE POINT46.4 ft. JOM - Joint Offset Medium61.9 ft. CM - Crack Multiple, from 08 to 01 o'clock, within 8 inches of joint: YES83.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"100 ft. CM - Crack Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES100 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 09 o'clock, , within 8 inches of joint: YES130.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES130.9 ft. CL - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES132 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"148.6 ft. CM - Crack Multiple, from 08 to 02 o'clock, within 8 inches of joint: YES169.1 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 09 to 11 o'clock, , within 8 inches of joint: YES174.2 ft. CL - Crack Longitudinal, at 01 o'clock, within 8 inches of joint: YES174.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: YES179.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 12 to 04 o'clock, , within 8 inches of joint: YES179.5 ft. CM - Crack Multiple, from 12 to 04 o'clock, within 8 inches of joint: YES180.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - OPEN187.2 ft. CM - Crack Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES187.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES192.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES192.3 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES207.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES207.7 ft. CM - Crack Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES212.9 ft. CM - Crack Multiple, from 01 to 04 o'clock, within 8 inches of joint: YES212.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 01 to 04 o'clock, , within 8 inches of joint: YES228.2 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 10 o'clock, , within 8 inches of joint: YES233.3 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES233.3 ft. B - Broken, from 10 to 12 o'clock, within 8 inches of joint: YES234.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"236 ft. JOM - Joint Offset Medium241.1 ft. CM - Crack Multiple, from 08 to 11 o'clock, within 8 inches of joint: YES241.1 ft. MGO - General Observation - CALCIUM LESS THAN 5%261.7 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES266.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES273.9 ft. MGO - General Observation - ROACHES INSIDE THE MH.273.9 ft. MWM - Water Mark, 20 %of cross sectional area273.9 ft. MWL - Water Level, 20 %of cross sectional area273.9 ft. AMH - Downstream Manhole, Survey Begins - 7:29 AM

Observation photos (11)

  • Joint Offset Medium

    37.9 ft. - Joint Offset Medium

  • Broken, from 10 to 12 o'clock, within 8 inches of joint: YES

    40.6 ft. - Broken, from 10 to 12 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

    143 ft. - Crack Longitudinal, at 10 o'clock, within 8 inches of joint: YES

  • Water Level, Sag in pipe, 30 %of cross sectional area, Start - POSSIBLE DEBRIS OR ANGLE POINT

    236.6 ft. - Water Level, Sag in pipe, 30 %of cross sectional area, Start - POSSIBLE DEBRIS OR ANGLE POINT

  • Deposits Attached Encrustation, 5 % TO 10 % of cross sectional area, from 08 to 11 o'clock,  , within 8 inches of joint: YES

    237.9 ft. - Deposits Attached Encrustation, 5 % TO 10 % of cross sectional area, from 08 to 11 o'clock, , within 8 inches of joint: YES

  • Joint Offset Large

    242.9 ft. - Joint Offset Large

  • Water Level, Sag in pipe, 35 %of cross sectional area, Change

    247.2 ft. - Water Level, Sag in pipe, 35 %of cross sectional area, Change

  • Water Level, Sag in pipe, 50 %of cross sectional area, Change

    257.8 ft. - Water Level, Sag in pipe, 50 %of cross sectional area, Change

  • Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    268 ft. - Fracture Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 % TO 10 % of cross sectional area, from 02 to 03 o'clock,  , within 8 inches of joint: NO

    273 ft. - Deposits Attached Encrustation, 5 % TO 10 % of cross sectional area, from 02 to 03 o'clock, , within 8 inches of joint: NO

  • General Observation - UNKNOWN DROP CONN. INSIDE THE MH. @ 09 O'CLOCK

    273.3 ft. - General Observation - UNKNOWN DROP CONN. INSIDE THE MH. @ 09 O'CLOCK

Observations (50)

DistanceCodeObservation
141.9TFC
257.8MWLS
0MGOROACHES INSIDE THE MH.
273MWLS
37.9JOM
237.9CM
81.6DAE
104.8DAE
86.6DAE
273.3MGOROACHES INSIDE THE MH.
0MWM
86.7CM
99.7CL
125.3CM
268FL
236.6MWLSPOSSIBLE DEBRIS OR ANGLE POINT
273.3MGOUNKNOWN DROP CONN. INSIDE THE MH. @ 09 O'CLOCK
173.9CM
32.8CM
81.6CM
0MWL
237.9DAE
273MGOSLIGHT GREASE THROUGHOUT THE REACH
173.9DAE
143DAE
99.7DAE
61CM
93TFOPEN
143CL
273DAE
273.9AMH8:19 AM
244.2TFC
247.2MWLS
242.9JOL
45.7DAE
61DAE
94.4DAE
40.6DAE
0AMH7:29 AM
32.8MGOCALCIUM LESS THAN 5%
212CM
66.2DAE
40.6B
190.3TFC
94.4CM
39.3TFC
66.2CM
7CM
12.2DAE
227.5JOM

Properties (4)

custom_field_three
BROKEN PIPE
custom_field_two
1
customer
LACSD
datetime
2016-08-28T07:28:26-07:00