19 0040_19 0039_8282016_063356.mp4
0 ft. - Water Level, 10 %of cross sectional area
35.8 ft. - Water Level, 15 %of cross sectional area
51.2 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES
61.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start
69.3 ft. - General Photograph - CALCIUM
74.4 ft. - General Photograph - CALCIUM
79.7 ft. - Joint Offset Medium
117.4 ft. - Broken, from 09 to 11 o'clock, within 8 inches of joint: YES
117.4 ft. - General Photograph - BROKEN PIPE
117.4 ft. - General Observation - POSSIBLE CAPPED CONN. OR REPAIR JOB, CONCRETE PEELING/FLAKING @ 10 O'CLOCK
118.4 ft. - Joint Separated Medium
118.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish
118.5 ft. - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 46.2 | CM | — |
| 7.6 | MGO | CALCIUM @ 12 O'CLOCK, LESS THAN 5% |
| 61.5 | DAE | — |
| 51.2 | DAE | — |
| 61.5 | CM | — |
| 118.5 | DAE | — |
| 15.2 | CL | — |
| 56.3 | DAE | — |
| 13.8 | TFC | — |
| 56.3 | CM | — |
| 119 | MGO | ACTIVE CONN. INSIDE THE MH. @ 09 O'CLOCK |
| 0 | MWL | — |
| 0 | AMH | 6:33 AM |
| 67.8 | TFC | — |
| 0 | MGO | ROACHES INSIDE THE MH. |
| 25.9 | DAE | — |
| 117.4 | B | — |
| 117.4 | MGP | BROKEN PIPE |
| 118.5 | CM | — |
| 66.6 | CL | — |
| 25.9 | CM | — |
| 118.5 | MGO | SLIGHT GREASE THROUGHOUT THE REACH |
| 120.1 | AMH | 7:05 AM |
| 12.8 | DAE | — |
| 12.8 | CM | — |
| 74.4 | MGP | CALCIUM |
| 15.2 | DAE | — |
| 118.4 | JSM | — |
| 0 | MWM | — |
| 119 | MGO | ROACHES INSIDE THE MH. |
| 41.1 | DAE | — |
| 69.3 | MGP | CALCIUM |
| 66.9 | JOM | — |
| 69.3 | CM | — |
| 41.1 | CM | — |
| 51.2 | CM | — |
| 119 | MGO | ACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK |
| 35.8 | MWL | — |
| 117.4 | MGO | POSSIBLE CAPPED CONN. OR REPAIR JOB, CONCRETE PEELING/FLAKING @ 10 O'CLOCK |
| 79.7 | JOM | — |
| 46.2 | DAE | — |