Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Aug 23, 2016, 07:26 AM
  • 01 0228_01 0227_8232016_005059.mp4

Date
08/23/2016
W/O
0586813
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00202
PipeID
P01270
Time
12:26 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0250
Sewer Name
01 COMPTON AVENUE TRUNK
City
HUNINGTON PARK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
06
Purpose
Capital Improvement Program Assesment
Project
20160823MDM_C0MPTON_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
10 in.
Upstream MH
01 0228
Downstream MH
01 0227
Dir. of Survey
Downstream
Length Surveyed
308.7 ft.
Total Length
308.7 ft.
Structural Index
3
Structural Quick
4535
Structural Rating
45
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
45
Pipe schematic from manhole 01 0228 to 01 0227
MH: 01 0228MH: 01 0227downstream0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:35AM2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MODERATE AGG5 ft. FC - Fracture Circumferential, from 08 to 11 o'clock, within 8 inches of joint: YES - SLIGHT8 ft. MGO - General Observation - 10" VCP55.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG56.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open59.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open59.5 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG61.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Active63.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG63.8 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG63.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC68.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - MODERATE AGG68.6 ft. MWM - Water Mark, 40 %of cross sectional area68.6 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC68.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - MODERATE97.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open125.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open125.6 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG128.4 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG130.5 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open132.6 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE153.1 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open153.5 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG168.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 6" - Open183.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open185.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING CONCRETE214.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open216.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open224.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open225 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG233.6 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG244.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open274.1 ft. FC - Fracture Circumferential, from 11 to 12 o'clock, within 8 inches of joint: YES - SLIGHT287.9 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 6" - Open292.2 ft. FC - Fracture Circumferential, from 09 to 10 o'clock, within 8 inches of joint: YES - SLIGHT308.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active308.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - MODERATE AGG308.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC308.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE308.7 ft. AMH - Downstream Manhole, Survey Ends - 1:35AM

Observation photos (11)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MODERATE AGG

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - MODERATE AGG

  • General Observation - 10" VCP

    8 ft. - General Observation - 10" VCP

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    55.5 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    59.5 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

    63.8 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES - SEVERE AGG SPORATIC

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    125.6 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    128.4 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

    132.6 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

    153.5 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

    185.1 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES - PEELING CONCRETE

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

    225 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES - SEVERE AGG

Observations (44)

DistanceCodeObservation
308.2MGOConn. @ Mh, 9 O' Clock. Active
168.3TFOpen
224.4TFOpen
308.2SAPMODERATE AGG
59.2TFOpen
0MGOConn. @ Mh, 9 O' Clock. Active
292.2FCSLIGHT
308.2SAPSEVERE AGG SPORATIC
153.5SAMSEVERE AGG
68.6SAPMODERATE AGG
153.1TFOpen
59.5SAMSEVERE AGG
55.5SAPSEVERE AGG
63.8SAPSEVERE AGG
214.6TFOpen
125.6TFOpen
8MGO10" VCP
308.7AMH1:35AM
61.6TFActive
244.7TFOpen
128.4SAMSEVERE AGG
2SAPMODERATE AGG
132.6SSSPEELING CONCRETE
287.9TFOpen
56.7TFOpen
63.8SAMSEVERE AGG
308.2SSSPEELING CONCRETE
185.1SSSPEELING CONCRETE
68.6MWM
125.6SAMSEVERE AGG
68.6SAPSEVERE AGG SPORATIC
0MWL
5FCSLIGHT
0MWM
225SAMSEVERE AGG
216.9TFOpen
63.8SAPSEVERE AGG SPORATIC
233.6SAMSEVERE AGG
0AMH12:35AM
274.1FCSLIGHT
68.6SAPMODERATE
183.7TFOpen
97.6TFOpen
130.5TFOpen

Properties (4)

custom_field_three
MISSING SEVERE AGG - PEELIN CONCRETE
custom_field_two
1
customer
LACSD
datetime
2016-08-23T00:26:09-07:00