Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jul 16, 2016, 09:43 AM
  • H 0333_H 0332_7162016_053640.mp4

Date
07/16/2016
W/O
0580376
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00175
PipeID
P10783
Time
2:43 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0189
Sewer Name
H JOINT OUTFALL H - UNIT 4
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
19A
Purpose
Capital Improvement Program Assesment
Project
20160716MDM_JOINT_OUTFALL_H_UNIT_4
Material
Reinforced Concrete Pipe
Shape
Circular
Height
57 in.
Upstream MH
H 0333
Downstream MH
H 0332
Dir. of Survey
Downstream
Length Surveyed
279.2 ft.
Total Length
279.2 ft.
Structural Index
3
Structural Quick
3200
Structural Rating
6
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
8
Pipe schematic from manhole H 0333 to H 0332
MH: H 0333MH: H 0332downstream0 ft. MWM - Water Mark, 40 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 5:35AM2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start2 ft. MGO - General Observation - MAG COAT 100% START6.6 ft. SAP - Surface Aggregate Projecting, from 01 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG8 ft. MGP - General Photograph - MAG COAT77.1 ft. SAP - Surface Aggregate Projecting, from 01 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG132.3 ft. MGP - General Photograph - 100% MAG COAT278.4 ft. MGO - General Observation - MAG COAT 100% FINISH278.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish278.4 ft. MGO - General Observation - METAL PIPE THROUGH MH279.2 ft. AMH - Downstream Manhole, Survey Ends - 6:05AM

Observation photos (7)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - MAG COAT 100% START

    2 ft. - General Observation - MAG COAT 100% START

  • Surface Aggregate Projecting, from 01 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    6.6 ft. - Surface Aggregate Projecting, from 01 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Photograph - MAG COAT

    8 ft. - General Photograph - MAG COAT

  • Surface Aggregate Projecting, from 01 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    77.1 ft. - Surface Aggregate Projecting, from 01 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Photograph - 100% MAG COAT

    132.3 ft. - General Photograph - 100% MAG COAT

  • General Observation - METAL PIPE THROUGH MH

    278.4 ft. - General Observation - METAL PIPE THROUGH MH

Observations (13)

DistanceCodeObservation
279.2AMH6:05AM
0MWM
278.4MGOMAG COAT 100% FINISH
2DAGS
278.4DAGS
77.1SAPSEVERE AGG
0MWL
6.6SAPSEVERE AGG
278.4MGOMETAL PIPE THROUGH MH
0AMH5:35AM
2MGOMAG COAT 100% START
132.3MGP100% MAG COAT
8MGPMAG COAT

Properties (4)

custom_field_three
SEVERE AGG - 100% MAG COAT
custom_field_two
3
customer
LACSD
datetime
2016-07-16T02:43:16-07:00