G 0147_G 0146_7142016_014947.mp4
2 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES, Start - SWOLLEN MORTAR & CONCRETE AREAS MISSING TILES
2 ft. - General Observation - MAG COAT 30% START 10:00 TO 2:00
2 ft. - General Observation - MISSING TILES 30% START
22.5 ft. - General Observation - MISSING TILES 30%
122.3 ft. - General Observation - TILES 90% IN PLACE
122.3 ft. - General Observation - MISSING TILES 10% START 10:00 TO 2:00
171.5 ft. - Surface Aggregate Visible, at 10 o'clock, within 8 inches of joint: NO - SEVERE AGG AREA OF MISSING TILE
198.9 ft. - Tap Factory Made Defective, at 02 o'clock, -, within 8 inches of joint: NO, 8" - 50% GREASE OR MAG COAT
198.9 ft. - Surface Aggregate Visible, at 03 o'clock, within 8 inches of joint: NO - AREA MISSING TILE
211.6 ft. - General Observation - MSSING TILES 20% START 10:00 TO 2:00
322.8 ft. - Surface Aggregate Visible, at 02 o'clock, within 8 inches of joint: YES - SEVERE AGG AREA MISSING TILE
| Distance | Code | Observation |
|---|---|---|
| 341.7 | AMH | 1:30AM |
| 341.2 | MGO | MISSING TILES 20% FINISH |
| 0 | MWL | — |
| 0 | MGO | Conn. @ Mh, 3 O' Clock. Active |
| 341.2 | MGO | MAG COAT 30% FINISH |
| 0 | AMH | 12:45AM |
| 22.5 | MGO | MISSING TILES 30% |
| 2 | SSS | SWOLLEN MORTAR & CONCRETE AREAS MISSING TILES |
| 198.9 | TFD | 50% GREASE OR MAG COAT |
| 211.6 | MGO | MSSING TILES 20% START 10:00 TO 2:00 |
| 0 | MWM | — |
| 2 | MGO | MAG COAT 30% START 10:00 TO 2:00 |
| 341.2 | SSS | SWOLLEN MORTAR & CONCRETE AREAS MISSING TILES |
| 341.2 | MGO | Conn. @ Mh, 9 O' Clock. Capped |
| 0 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 122.3 | MGO | TILES 90% IN PLACE |
| 198.9 | SAV | AREA MISSING TILE |
| 171.5 | SAV | SEVERE AGG AREA OF MISSING TILE |
| 341.2 | MGO | Conn. @ Mh, 3 O' Clock. Capped |
| 2 | MGO | MISSING TILES 30% START |
| 322.8 | SAV | SEVERE AGG AREA MISSING TILE |
| 122.3 | MGO | MISSING TILES 10% START 10:00 TO 2:00 |
| 122.3 | MGO | MISSING TILES 30% FINISH |