Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 30, 2016, 03:45 PM
  • 29 0528_29 0527_6302016_094832.mp4

Date
06/30/2016
W/O
0574371
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z01106
PipeID
P24581
Time
8:45 AM
Certificate
U-115-06022628
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7164
Sewer Name
29 19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
20160630MI_19TH_STREET_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0528
Downstream MH
29 0527
Dir. of Survey
Downstream
Length Surveyed
295.2 ft.
Total Length
295.2 ft.
Structural Index
3
Structural Quick
3B23
Structural Rating
57
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
59
Pipe schematic from manhole 29 0528 to 29 0527
MH: 29 0528MH: 29 0527downstream0 ft. MWM - Water Mark, 10 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 09:47AM7 ft. CM - Crack Multiple, from 12 to 03 o'clock, within 8 inches of joint: NO8 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6" - Open10.5 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"12.6 ft. CM - Crack Multiple, from 08 to 11 o'clock, within 8 inches of joint: NO27.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES33.8 ft. CM - Crack Multiple, from 12 to 01 o'clock, within 8 inches of joint: YES39.6 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES42.3 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES48.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES59.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"61.5 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"63.3 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES74.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES92 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES105 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES109.1 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"111 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES111.5 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 6"117.6 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"136.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES149 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES165.4 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6" - Open167.9 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 6"190.1 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES208.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES215.2 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: YES, 6" - Open232.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES244.2 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES260.1 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 6" - Open262.4 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 6" - Open270.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES273.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES281.6 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES295.2 ft. MGO - General Observation - ROACHES > 50 AT MH295.2 ft. AMH - Downstream Manhole, Survey Ends - 10:35AM

Observation photos (8)

  • Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

    42.3 ft. - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    63.3 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    74.5 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES

    92 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    136.6 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

    190.1 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    281.6 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Downstream Manhole, Survey Ends - 10:35AM

    295.2 ft. - Downstream Manhole, Survey Ends - 10:35AM

Observations (38)

DistanceCodeObservation
167.9TFA
8TFOpen
262.4TFOpen
190.1CL
281.6CM
61.5TFA
270.1CM
109.1TFA
295.2MGOROACHES > 50 AT MH
244.2CM
165.4TFOpen
111CL
59.1TFA
92DAGS
105CM
295.2AMH10:35AM
42.3CM
111.5TFA
12.6CM
273.4CM
208.4CM
33.8CM
48.5CM
0MWM
27.5CM
39.6CM
74.5CM
232.2CM
117.6TFA
0MWL
0AMH09:47AM
63.3CL
149CM
10.5TFA
7CM
136.6CM
215.2TFOpen
260.1TFOpen

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2016-06-30T08:45:19-07:00