Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 30, 2016, 03:47 PM
  • 29 0526_29 0513_6302016_110505.mp4

Date
06/30/2016
W/O
0574371
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z01106
PipeID
P24578
Time
8:47 AM
Certificate
U-115-06022628
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7164
Sewer Name
29 19TH STREET SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
20160630MI_19TH_STREET_SEWER
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0526
Downstream MH
29 0513
Dir. of Survey
Downstream
Length Surveyed
302.1 ft.
Total Length
302.1 ft.
Structural Index
3
Structural Quick
3A21
Structural Rating
32
O&M Index
2
O&M Quick
2700
O&M Rating
14
Overall Index
3
Overall Quick
Overall Rating
46
Pipe schematic from manhole 29 0526 to 29 0513
MH: 29 0526MH: 29 0513downstream0 ft. MGO - General Observation - ROACHES > 50 AT MH0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 11:03AM0 ft. MWM - Water Mark, 10 %of cross sectional area24.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES25.6 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"56.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES70.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES83.8 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"112.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES124.8 ft. CS - Crack Spiral, from 11 to 02 o'clock, within 8 inches of joint: YES129.3 ft. TFA - Tap Factory Made Active, at 03 o'clock, -, within 8 inches of joint: YES, 6" - Active155.3 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES170.8 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES175.8 ft. RTJ - Roots Tap Joint, at 09 o'clock, 5 %, within 8 inches of joint: YESR179.2 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES180.6 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: YES, 6"188.3 ft. RTJ - Roots Tap Joint, at 08 o'clock, 5 %, within 8 inches of joint: YESR200.3 ft. RTJ - Roots Tap Joint, at 04 o'clock, 10 %, within 8 inches of joint: YESR201.1 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES209.4 ft. RTJ - Roots Tap Joint, at 07 o'clock, 5 %, within 8 inches of joint: YESR220.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES232.4 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: YES, 6" - Unkown260.4 ft. RTJ - Roots Tap Joint, from 03 to 04 o'clock, 5 %, within 8 inches of joint: YESR261.5 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES270 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES276.4 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES302.1 ft. MGO - General Observation - ROACHES >50 AT MH302.1 ft. MGO - General Observation - CONNECTION AT MH, 9 OCLOCK, ACTIVE302.1 ft. AMH - Downstream Manhole, Survey Ends - 11:40 PM

Observation photos (11)

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    70.7 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    112.4 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 11 to 02 o'clock, within 8 inches of joint: YES

    124.8 ft. - Crack Spiral, from 11 to 02 o'clock, within 8 inches of joint: YES

  • Roots Tap Joint, at 09 o'clock, 5 %, within 8 inches of joint: YESR

    175.8 ft. - Roots Tap Joint, at 09 o'clock, 5 %, within 8 inches of joint: YESR

  • Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

    179.2 ft. - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Roots Tap Joint, at 08 o'clock, 5 %, within 8 inches of joint: YESR

    188.3 ft. - Roots Tap Joint, at 08 o'clock, 5 %, within 8 inches of joint: YESR

  • Roots Tap Joint, at 04 o'clock, 10 %, within 8 inches of joint: YESR

    200.3 ft. - Roots Tap Joint, at 04 o'clock, 10 %, within 8 inches of joint: YESR

  • Roots Tap Joint, at 07 o'clock, 5 %, within 8 inches of joint: YESR

    209.4 ft. - Roots Tap Joint, at 07 o'clock, 5 %, within 8 inches of joint: YESR

  • Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES

    220.4 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES

  • Roots Tap Joint, from 03 to 04 o'clock, 5 %, within 8 inches of joint: YESR

    260.4 ft. - Roots Tap Joint, from 03 to 04 o'clock, 5 %, within 8 inches of joint: YESR

  • Downstream Manhole, Survey Ends - 11:40 PM

    302.1 ft. - Downstream Manhole, Survey Ends - 11:40 PM

Observations (30)

DistanceCodeObservation
0MGOROACHES > 50 AT MH
0MWL
276.4CM
0AMH11:03AM
270CM
232.4TFUnkown
56.8DAGS
175.8RTJ
302.1MGOROACHES >50 AT MH
24.1CM
0MWM
70.7CM
260.4RTJ
124.8CS
302.1MGOCONNECTION AT MH, 9 OCLOCK, ACTIVE
25.6TFA
179.2CM
180.6TFA
201.1CM
261.5CM
155.3CM
209.4RTJ
129.3TFAActive
200.3RTJ
83.8TFA
170.8CM
188.3RTJ
112.4CM
302.1AMH11:40 PM
220.4DAGS

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2016-06-30T08:47:16-07:00