Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 23, 2016, 11:06 AM
  • A 1226_A 0302_6232016_042000.mp4

Date
06/23/2016
W/O
0574368
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00325
PipeID
P08213
Time
4:06 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
HO166
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
WHITTIER
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
15
Purpose
Capital Improvement Program Assesment
Project
20160621MDM_JOA_1A_SAN_JOSE_CREEK_WRP_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Upstream MH
A 1226
Downstream MH
A 0302
Dir. of Survey
Downstream
Length Surveyed
48.6 ft.
Total Length
48.6 ft.
Structural Index
5
Structural Quick
5341
Structural Rating
19
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
5
Overall Quick
Overall Rating
23
Pipe schematic from manhole A 1226 to A 0302
MH: A 1226MH: A 0302downstream0 ft. MWM - Water Mark, 60 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:05AM0 ft. MWL - Water Level, 20 %of cross sectional area - NO FLOW0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active LARGE LINE OUTGOING2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG2 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM & LONG REBAR20 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES - CIRCUM & LONG REBAR20 ft. MGO - General Observation - ZOOM 28'20 ft. SRC - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - MISSING REBAR48.2 ft. SRC - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - CIRCUM & LONG REBAR48.2 ft. SAM - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG48.6 ft. AMH - Downstream Manhole, Survey Ends - 4:40AM

Observation photos (7)

  • Water Level, 20 %of cross sectional area - NO FLOW

    0 ft. - Water Level, 20 %of cross sectional area - NO FLOW

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM & LONG REBAR

    2 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES, Start - CIRCUM & LONG REBAR

  • Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES - CIRCUM & LONG REBAR

    20 ft. - Surface Reinforcement Corroded, from 09 to 03 o'clock, within 8 inches of joint: YES - CIRCUM & LONG REBAR

  • General Observation - ZOOM 28'

    20 ft. - General Observation - ZOOM 28'

  • Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - MISSING REBAR

    20 ft. - Surface Reinforcement Corroded, from 10 to 02 o'clock, within 8 inches of joint: NO - MISSING REBAR

  • Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG

    48.2 ft. - Surface Aggregate Missing, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG

Observations (12)

DistanceCodeObservation
2SAMSEVERE AGG
20SRCCIRCUM & LONG REBAR
48.2SRCCIRCUM & LONG REBAR
0MWM
48.6AMH4:40AM
0AMH4:05AM
0MWLNO FLOW
0MGOConn. @ Mh, 9 O' Clock. Active LARGE LINE OUTGOING
20MGOZOOM 28'
2SRCCIRCUM & LONG REBAR
48.2SAMSEVERE AGG
20SRCMISSING REBAR

Properties (4)

custom_field_three
CORRODED & MISSING CIRCUM & LONG REBAR
custom_field_two
2
customer
LACSD
datetime
2016-06-23T04:06:17-07:00