Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 18, 2016, 10:20 AM
Date
06/18/2016
W/O
0574862
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00325
PipeID
P08216
Time
3:20 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6721
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
WHITTIER
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
29
Purpose
Routine Assessment
Project
20160618MDM_JOA_1A_SAN_JOSE_CREEK_WRP_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
63 in.
Upstream MH
A 0306
Downstream MH
A 0305
Dir. of Survey
Downstream
Length Surveyed
1080.5 ft.
Total Length
1080.5 ft.
Structural Index
3
Structural Quick
3j2j
Structural Rating
1077
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
1077
Pipe schematic from manhole A 0306 to A 0305
MH: A 0306MH: A 0305downstream0 ft. AMH - Upstream Manhole, Survey Begins - 4:10AM0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2 ft. MGO - General Observation - SEALED JOINTS START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. MGO - General Observation - HANGING MASTIC START7.9 ft. MGO - General Observation - BOLT15.1 ft. MGO - General Observation - LOOSE GASKET SEAM 12:0017.9 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC23.2 ft. MGO - General Observation - LOOSE GACKET SEAM43.5 ft. MGO - General Observation - HANGING MASTIC FINISH50 ft. MGO - General Observation - MAG COAT 40% START74.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC128 ft. MGO - General Observation - LOOSE GASKET SEAM135.8 ft. MGO - General Observation - LOOSE GASKET SEAM143.2 ft. MGO - General Observation - LOOSE GASKET SEAM183.1 ft. MGO - General Observation - LOOSE SEAM GASKET238.9 ft. MGO - General Observation - LOOSE GASKET SEAM246.6 ft. MGO - General Observation - LOOSE GASKET SEAM272.2 ft. MGO - General Observation - SEALED JOINTS FINISH272.2 ft. MGO - General Observation - RAISED JOINTS SRART272.2 ft. MGO - General Observation - MAG COAT 40% FINISH318.5 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC410.1 ft. SAV - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG608.9 ft. MGO - General Observation - RAISED JOINTS FINISH642.1 ft. MGO - General Observation - MAG COAT 60% START1080 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC1080 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE1080.5 ft. AMH - Downstream Manhole, Survey Ends - 5:35AM

Observation photos (21)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • General Observation - HANGING MASTIC START

    2 ft. - General Observation - HANGING MASTIC START

  • General Observation - BOLT

    7.9 ft. - General Observation - BOLT

  • General Observation - LOOSE GASKET SEAM 12:00

    15.1 ft. - General Observation - LOOSE GASKET SEAM 12:00

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    17.9 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • General Observation - LOOSE GACKET SEAM

    23.2 ft. - General Observation - LOOSE GACKET SEAM

  • General Observation - HANGING MASTIC FINISH

    43.5 ft. - General Observation - HANGING MASTIC FINISH

  • General Observation - MAG COAT 40% START

    50 ft. - General Observation - MAG COAT 40% START

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    74.1 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • General Observation - LOOSE GASKET SEAM

    128 ft. - General Observation - LOOSE GASKET SEAM

  • General Observation - LOOSE GASKET SEAM

    135.8 ft. - General Observation - LOOSE GASKET SEAM

  • General Observation - LOOSE GASKET SEAM

    143.2 ft. - General Observation - LOOSE GASKET SEAM

  • General Observation - LOOSE SEAM GASKET

    183.1 ft. - General Observation - LOOSE SEAM GASKET

  • General Observation - LOOSE GASKET SEAM

    238.9 ft. - General Observation - LOOSE GASKET SEAM

  • General Observation - LOOSE GASKET SEAM

    246.6 ft. - General Observation - LOOSE GASKET SEAM

  • General Observation - RAISED JOINTS SRART

    272.2 ft. - General Observation - RAISED JOINTS SRART

  • General Observation - MAG COAT 40% FINISH

    272.2 ft. - General Observation - MAG COAT 40% FINISH

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    318.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

  • Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

    410.1 ft. - Surface Aggregate Visible, from 09 to 11 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Observation - RAISED JOINTS FINISH

    608.9 ft. - General Observation - RAISED JOINTS FINISH

  • General Observation - MAG COAT 60% START

    642.1 ft. - General Observation - MAG COAT 60% START

Observations (29)

DistanceCodeObservation
272.2MGOSEALED JOINTS FINISH
43.5MGOHANGING MASTIC FINISH
272.2MGORAISED JOINTS SRART
272.2MGOMAG COAT 40% FINISH
143.2MGOLOOSE GASKET SEAM
128MGOLOOSE GASKET SEAM
318.5SAVSEVERE AGG SPORATIC
23.2MGOLOOSE GACKET SEAM
608.9MGORAISED JOINTS FINISH
0AMH4:10AM
642.1MGOMAG COAT 60% START
15.1MGOLOOSE GASKET SEAM 12:00
17.9SAVSEVERE AGG SPORATIC
2MGOSEALED JOINTS START
74.1SAVSEVERE AGG SPORATIC
238.9MGOLOOSE GASKET SEAM
1080SAVSEVERE AGG SPORATIC
50MGOMAG COAT 40% START
0MWM
7.9MGOBOLT
183.1MGOLOOSE SEAM GASKET
2SSSBLISTERING PEELING CONCRETE
246.6MGOLOOSE GASKET SEAM
135.8MGOLOOSE GASKET SEAM
1080SSSBLISTERING PEELING CONCRETE
1080.5AMH5:35AM
410.1SAVSEVERE AGG
0MWL
2MGOHANGING MASTIC START

Properties (4)

custom_field_three
SEVERE AGG VISIBLE
custom_field_two
3
customer
LACSD
datetime