2 ft. - General Observation - MAG COAT 99% 7:00 TO 5:00
200.2 ft. - General Observation - MAG COAT
200.2 ft. - General Observation - MAG COAT 100%
318.9 ft. - Surface Spalling, from 10 to 02 o'clock, within 8 inches of joint: YES - BLISTERING LAITANCE COAT
348 ft. - Surface Spalling, from 12 to 01 o'clock, within 8 inches of joint: YES - BLISTERING LAITANCE COAT
350.8 ft. - Surface Spalling, from 10 to 11 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT
362.5 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
372 ft. - General Observation - MAG COAT 100%
394.7 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: NO - BLISTERING LAITACE COAT
402.4 ft. - General Observation - 98% MAG COAT START
419.8 ft. - Surface Spalling, from 11 to 01 o'clock, within 8 inches of joint: YES - BLISTERING LAITANCE COAT
434.3 ft. - General Observation - 100% MAG COAT START
508.3 ft. - General Observation - ZOOM 13'
| Distance | Code | Observation |
|---|---|---|
| 350.8 | SSS | BLISTERING LAITANCE COAT |
| 348 | SSS | BLISTERING LAITANCE COAT |
| 0 | MWL | — |
| 2 | MGO | MAG COAT 99% 7:00 TO 5:00 |
| 200.2 | MGO | MAG COAT |
| 318.9 | SSS | BLISTERING LAITANCE COAT |
| 200.2 | MGO | MAG COAT 100% |
| 521.2 | MGO | MAG COAT 100% FINISH |
| 402.4 | MGO | 98% MAG COAT START |
| 372 | MGO | MAG COAT 100% |
| 0 | MWM | — |
| 394.7 | SSS | BLISTERING LAITACE COAT |
| 0 | AMH | 4:20AM |
| 362.5 | SSS | BLISTERING CONCRETE |
| 508.3 | MGO | ZOOM 13' |
| 419.8 | SSS | BLISTERING LAITANCE COAT |
| 521.6 | AMH | 5:15AM |
| 434.3 | MGO | 100% MAG COAT START |
| 362.5 | MGO | MAG COAT 95% |