Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 9, 2016, 08:12 AM
  • H 1375_15 0149_692016_045704.mp4

Date
06/09/2016
W/O
0568722
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00635
PipeID
P12051
Time
1:12 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0154
Sewer Name
15 TYLER AVENUE RELIEF TRUNK
City
EL MONTE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
23
Purpose
Routine Assessment
Project
20160606MDM_TYLER_AVENUE_RELIEF_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
H 1375
Downstream MH
15 0149
Dir. of Survey
Downstream
Length Surveyed
10.4 ft.
Total Length
10.4 ft.
Structural Index
2
Structural Quick
2200
Structural Rating
4
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
4
Pipe schematic from manhole H 1375 to 15 0149
MH: H 1375MH: 15 0149downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:50AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active LARGE OUTGOING LINE2 ft. MGO - General Observation - ZOOM 8'2 ft. MGO - General Observation - POSSIBLE REBAR CIRCUM AT SOFFIT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING LAITANCE COAT10 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING LAITANCE COAT10.4 ft. AMH - Downstream Manhole, Survey Ends - 5:00AM

Observation photos (4)

  • General Observation - POSSIBLE REBAR CIRCUM AT SOFFIT

    2 ft. - General Observation - POSSIBLE REBAR CIRCUM AT SOFFIT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING LAITANCE COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING LAITANCE COAT

  • Downstream Manhole, Survey Ends - 5:00AM

    10.4 ft. - Downstream Manhole, Survey Ends - 5:00AM

Observations (10)

DistanceCodeObservation
2MGOZOOM 8'
10.4AMH5:00AM
2MGOPOSSIBLE REBAR CIRCUM AT SOFFIT
0MWL
10SSSBLISTERING LAITANCE COAT
0MWM
2SSSBLISTERING LAITANCE COAT
0AMH4:50AM
2SSSBLISTERING LAITANCE COAT
0MGOConn. @ Mh, 3 O' Clock. Active LARGE OUTGOING LINE

Properties (4)

custom_field_three
LAITANCE COAT SPALLING-BLISTERING PEELING
custom_field_two
4
customer
LACSD
datetime
2016-06-09T01:12:31-07:00