Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jun 7, 2016, 08:16 AM
  • 15 0924_15 0157_672016_033219.mp4

Date
06/07/2016
W/O
0568722
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00635
PipeID
P12062
Time
1:16 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H0152
Sewer Name
15 TYLER AVENUE RELIEF TRUNK
City
EL MONTE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
23
Purpose
Routine Assessment
Project
20160606MDM_TYLER_AVENUE_RELIEF_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
30 in.
Upstream MH
15 0924
Downstream MH
15 0157
Dir. of Survey
Downstream
Length Surveyed
565.9 ft.
Total Length
565.9 ft.
Structural Index
3
Structural Quick
3322
Structural Rating
13
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
13
Pipe schematic from manhole 15 0924 to 15 0157
MH: 15 0924MH: 15 0157downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 3:10AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. OPEN0 ft. MWL - Water Level, 5 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 60% START2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING LAITANCE COAT55.7 ft. MGO - General Observation - MAG COAT 80% START153.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open208.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT227.9 ft. MWM - Water Mark, 40 %of cross sectional area281.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Active311.3 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SEVERE AGG329.3 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - ACTIVE340.9 ft. SAV - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG POSSIBLE370 ft. MWM - Water Mark, 30 %of cross sectional area485.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: NO, 6" - Active508.2 ft. SAV - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG565.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING LAITANCE COAT565.4 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active565.9 ft. AMH - Downstream Manhole, Survey Ends - 4:05AM

Observation photos (9)

  • General Observation - MAG COAT 60% START

    2 ft. - General Observation - MAG COAT 60% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING LAITANCE COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING LAITANCE COAT

  • General Observation - MAG COAT 80% START

    55.7 ft. - General Observation - MAG COAT 80% START

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT

    208.9 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING LAITANCE COAT

  • Water Mark, 40 %of cross sectional area

    227.9 ft. - Water Mark, 40 %of cross sectional area

  • Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SEVERE AGG

    311.3 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: YES - SEVERE AGG

  • Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG POSSIBLE

    340.9 ft. - Surface Aggregate Visible, from 11 to 01 o'clock, within 8 inches of joint: NO - SEVERE AGG POSSIBLE

  • Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

    508.2 ft. - Surface Aggregate Visible, from 10 to 02 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • General Observation - Conn. @ Mh, 9 O' Clock. Active

    565.4 ft. - General Observation - Conn. @ Mh, 9 O' Clock. Active

Observations (20)

DistanceCodeObservation
0MWM
311.3SAVSEVERE AGG
0AMH3:10AM
565.4SSSBLISTERING LAITANCE COAT
2MGOMAG COAT 60% START
508.2SAVSEVERE AGG
565.9AMH4:05AM
340.9SAVSEVERE AGG POSSIBLE
485.5TBActive
565.4MGOConn. @ Mh, 9 O' Clock. Active
329.3TBACTIVE
208.9SSSBLISTERING LAITANCE COAT
227.9MWM
0MGOConn. @ Mh, 3 O' Clock. OPEN
370MWM
55.7MGOMAG COAT 80% START
2SSSBLISTERING LAITANCE COAT
0MWL
153.4TBOpen
281.4TBActive

Properties (4)

custom_field_three
FEW SEVERE AGG-SPALLING LAITANCE COAT
custom_field_two
4
customer
LACSD
datetime
2016-06-07T01:16:33-07:00