Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 25, 2016, 03:56 PM
  • 18 0275_18 0274_5252016_085955.mp4

Date
05/25/2016
W/O
0568850
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00702
PipeID
P14103
Time
8:56 AM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7131
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
20160523AM_SHOEMAKER_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
18 0275
Downstream MH
18 0274
Dir. of Survey
Downstream
Length Surveyed
153.2 ft.
Total Length
153.2 ft.
Structural Index
2
Structural Quick
3122
Structural Rating
7
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole 18 0275 to 18 0274
MH: 18 0275MH: 18 0274downstream0 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 35 %of cross sectional area0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. AMH - Upstream Manhole, Survey Begins - 8:58 AM2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start2 ft. MGO - General Observation - 50% MAG COAT FROM 09 TO 03 O'CLOCK, START18.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"22.2 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 4" - OPEN67.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6"67.9 ft. MGO - General Observation - 50% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH70.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 6"112.2 ft. CL - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES - POSSIBLE119.4 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - UNKNOWN122.6 ft. TBA - Tap Break-In Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"151.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish151.2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish151.2 ft. MGO - General Observation - SAGS THROUGHOUT THE REACH151.2 ft. MGO - General Observation - SLIGHT DEBRIS THROUGHOUT THE REACH151.9 ft. MGO - General Observation - ROACHES INSIDE THE MH.153.2 ft. AMH - Downstream Manhole, Survey Ends - 9:19 AM

Observation photos (3)

  • General Observation - 50% MAG COAT FROM 09 TO 03 O'CLOCK, START

    2 ft. - General Observation - 50% MAG COAT FROM 09 TO 03 O'CLOCK, START

  • General Observation - 50% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH

    67.9 ft. - General Observation - 50% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH

  • Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES - POSSIBLE

    112.2 ft. - Crack Longitudinal, at 02 o'clock, within 8 inches of joint: YES - POSSIBLE

Observations (22)

DistanceCodeObservation
70.9TFC
0MGOACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK
0MWM
151.2SSS
151.2SAV
151.2MGOSAGS THROUGHOUT THE REACH
2SAV
0MWL
18.9TFC
151.2MGOSLIGHT DEBRIS THROUGHOUT THE REACH
0MGOROACHES INSIDE THE MH.
22.2TBOPEN
153.2AMH9:19 AM
2SSS
67.9TFC
2MGO50% MAG COAT FROM 09 TO 03 O'CLOCK, START
112.2CLPOSSIBLE
122.6TBA
0AMH8:58 AM
151.9MGOROACHES INSIDE THE MH.
119.4TFUNKNOWN
67.9MGO50% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2016-05-25T08:56:07-07:00