Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 24, 2016, 08:11 PM
  • 18 0277_18 0276_5242016_131326.mp4

Date
05/24/2016
W/O
0568850
Weather
Dry
Operator/Surveyor
MIRANDA
Sewer ID
Z00702
PipeID
P14105
Time
1:11 PM
Certificate
U-1014-06022542
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7130
Sewer Name
18 SHOEMAKER AVENUE TRUNK
City
NORWALK
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
30
Purpose
Routine Assessment
Project
20160523AM_SHOEMAKER_AVENUE_TRUNK
Material
NRCP
Shape
Circular
Height
15 in.
Upstream MH
18 0277
Downstream MH
18 0276
Dir. of Survey
Downstream
Length Surveyed
47.5 ft.
Total Length
47.5 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 18 0277 to 18 0276
MH: 18 0277MH: 18 0276downstream0 ft. MGO - General Observation - ROACHES INSIDE THE MH.0 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 1:11 PM0 ft. MGO - General Observation - ACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK0 ft. MWL - Water Level, 35 %of cross sectional area2 ft. MGO - General Observation - 65% MAG COAT FROM 09 TO 03 O'CLOCK, START2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Start2 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start22.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 6"25.3 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"44.8 ft. MGO - General Observation - 65% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH44.8 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish44.8 ft. SAV - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Finish44.8 ft. MGO - General Observation - SLIGHT DEBRIS THROUGHOUT THE REACH45.4 ft. MGO - General Observation - ROACHES INSIDE THE MH.47.5 ft. AMH - Downstream Manhole, Survey Ends - 1:21 PM

Observation photos (3)

  • Upstream Manhole, Survey Begins - 1:11 PM

    0 ft. - Upstream Manhole, Survey Begins - 1:11 PM

  • General Observation - 65% MAG COAT FROM 09 TO 03 O'CLOCK, START

    2 ft. - General Observation - 65% MAG COAT FROM 09 TO 03 O'CLOCK, START

  • Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

    2 ft. - Surface Aggregate Visible, from 09 to 03 o'clock, within 8 inches of joint: NO, Start

Observations (16)

DistanceCodeObservation
22.1TFC
0MGOROACHES INSIDE THE MH.
0MWM
45.4MGOROACHES INSIDE THE MH.
25.3TFA
0AMH1:11 PM
2MGO65% MAG COAT FROM 09 TO 03 O'CLOCK, START
44.8MGO65% MAG COAT FROM 09 TO 03 O'CLOCK, FINISH
44.8SSS
47.5AMH1:21 PM
2SSS
44.8SAV
44.8MGOSLIGHT DEBRIS THROUGHOUT THE REACH
0MGOACTIVE CONN. INSIDE THE MH. @ 03 O'CLOCK
2SAV
0MWL

Properties (3)

custom_field_two
3
customer
LACSD
datetime
2016-05-24T13:11:09-07:00